Similar Projects
Police Station
New Construction - 28,104 SF
Bidding
$1,000,000 to $5,000,000 CJ est. value
Frankfort, IN 46041

Pulaski County Justice Center
New Construction
Bidding
Winamac, IN

Fire Crash/Rescue Station, B770
Renovation, Addition
Post-Bid
$1,000,000 to $5,000,000 est. value
Fort Wayne, IN 46809

Hendricks County Sheriff's Office and Jail - Bid Release 2
Post-Bid
Danville, IN 46122

Fire Department Training Building
New Construction
Results
Indianapolis, IN 46214

Middlebury Township Fire Station
Renovation
Results
Middlebury, IN 46540

Kentland Fire Station
New Construction - 9,895 SF
Construction
Less than $1,200,000 est. value
Kentland, IN 47951

Fabrication Two Story Walkout
New Construction
Bidding
Fort Wayne, IN 46803

Live Fire & Rescue Training Facility - RFP
New Construction
Post-Bid
Avon, IN 46123

Station #3 Repairs
Renovation
Results
Evansville, IN 47710

New Carlisle Fire Station
Renovation
Bidding
$750,000 est. value
New Carlisle, IN 46552

Police Range Training Center
New Construction
Post-Bid
Less than $400,000 est. value
Hammond, IN 46323

Camp Atterbury Central Fire Station
Results
Less than $150,000 est. value
Edinburgh, IN 46124

Avon Fire Station 144
Post-Bid
Avon, IN

Volunteer Fire Station Number 14
Renovation, Addition
Results
Bloomington, IN 47404

Reported 05/20/2021 12:00 AM
Project Title

Police Department Headquarters & Court Expansoin

Physical Address View project details and contacts
City, State (County) Carmel, IN   (Hamilton County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected July 2022, Construction Completion Expected April 2024
Bids Due View project details and contacts
Estimated Value $22,500,000
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Project involves the development, design, construction, procurement of FFE (furniture, fixtures, and equipment), operation, and maintenance of an expansion and renovation to the police headquarters and addition of City Court, which will provide space and services for the law enforcement and justice systems. The Project consists of an expanded and renovated police headquarters building, court facilities and offices for the City Clerk. City currently contemplates that the Project will include: • Demolition, clearing, and all site preparations at 998 South Rangeline Road (the “Huntington Bank Site”). • Partial renovation of the existing police station at 3 Civic Square (the “Police Station Site”) including, but not limited to, certain new finishes, space plan changes, electrical and mechanical upgrades, and reconfiguration of the site layout. • A two-story infill addition to the existing building north of the current entrance on the Police Station Site. • A three-story building addition that will be located on the Huntington Bank Site with mezzanine mechanical space that will provide a new public entry from Rangeline Road. • A sally port that connects the existing building to the new three-story addition, which includes limited parking, prisoner transfer facilities, fitness center, training space, vehicle storage and armory. • Site upgrades to the Rangeline Road frontage including stair and ramp system with planters to act as vehicle buffers. • All necessary utility and site improvements to support both the existing building and new addition. The existing police station will continue to operate during construction and renovation. Careful coordination with the police department leadership will be critical to preserving operational efficiency as well as providing for the physical safety of both public visitors and department personnel throughout the construction phase. It is expected that the three-story addition will be completed and operations will be relocated into the addition while the existing building is renovated. While generally the police department operates 24 hours per day, 7 days per week, night time and weekend work may be necessary to properly construct some portions of the existing building renovation to minimize disruption. Site development includes any and all site development required for the development of this Project, including but not limited to on-site new utilities and reconfiguration of existing utilities, hardscape/landscape, road and traffic control improvements (on and adjacent to the site), parking modifications, overall site security upgrades, and utility improvements from the property boundary to support the Project.

Details

Fire/Police Station, Addition.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents