Similar Projects
Barclay Avenue Multilaning - 100380 - Hernando County
Infrastructure
Conception
$17,584,082 CJ est. value
Spring Hill, FL 34609

Coastal Way Intersection - 105900 - County of Hernando
Infrastructure
Conception
$650,000 CJ est. value
Brooksville, FL 34613

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

U-Haul Moving & Storage of Brooksville
Addition, Infrastructure - 117,712 SF
Design
$13,000,000 CJ est. value
Brooksville, FL 34601

Jenkin's Creek Fishing Pier and Pedestrian Bridge Replacement
Demolition, New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
Brooksville, FL 34601

New Construction of Utilities Facility
New Construction, Build-Out - 30,000 SF
Post-Bid
Brooksville, FL 34601

Bayou Drive Restoration Stabilization Shoulder Repair
Infrastructure
Post-Bid
$200,000 CJ est. value
Bayport, FL 34607

Y--Design-Build/Design-Bid-Build Indefinite Delivery/Indefinite Quantity Firm Fixed Price Multiple Award Construction Contract, NAVFAC SE Area of Operations
Results
$20,000,000 to $900,000,000 est. value

Construction Services Performed on AJW-242 Unstaffed Infrastructure Sustainment (UIS) Facilities On and Off Airport Operating Areas
Results
Less than $150,000,000 est. value

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Livano at Nature Coast
New Construction, Infrastructure
Construction
$131,300,000 CJ est. value
Spring Hill, FL 34608

Kettering Road Industrial Development
New Construction, Infrastructure - 2,400,000 SF
Pending Verification
$1,000,000,000 CJ est. value
Brooksville, FL 34602

Milkaway Farms
New Construction, Infrastructure - 50,000 SF
Pending Verification
$400,000,000 CJ est. value
Brooksville, FL 34601

South Brooksville BMP-2 Drainage Improvement - 106220 - County of Hernando
Infrastructure
Conception
$1,000,000 CJ est. value
Brooksville, FL 34601

Peck Sink Trail and Overlook Project
Infrastructure
Post-Bid
$527,300 CJ est. value
Brooksville, FL 34601

Last Updated 09/05/2023 09:33 AM
Project Title

Brooksville Public Works

Physical Address View project details and contacts
City, State (County) Brooksville, FL 34601   (Hernando County)
Category(s) Commercial, Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Site Development, Warehouse/Storage
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $3,800,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

You are invited to submit final pricing based on the 100% Bid Set for the Brooksville Public Works facility located in Brooksville, FL. It includes site development and new construction of a 10,000 single-story pre-engineered metal building with 6,426 square feet of it functioning as office space and 3,574 square feet functioning as shop/warehouse space. Trades required include cast-in-place concrete, miscellaneous metals, casework, waterproofing, doors, glass/glazing, overhead doors, metal framing & drywall, acoustical ceilings, painting, flooring, toilet accessories, signage, pre-engineered metal building, fire protection, plumbing, HVAC, electrical, data/communications, sitework, fencing, and landscaping. As of September 5, 2023, RFI responses have been released in Addendum 3. Construction is anticipated to start in October 2023 and take 10.5 months.

Details

,, 10,000 SF - 6,426 SF. 3,574 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents