Similar Projects
Slabjacking and Subsealing Services
Infrastructure
Results

RFQ D/B - KC-46A 3-Bay Maintenance Hangar at Tinker AFB, Oklahoma
New Construction, Infrastructure
Post-Bid
$148,925,456 CJ est. value
Oklahoma City, OK 73145

RFQ D/B - KC-46A 3-Bay Maintenance Hangar at Tinker AFB, Oklahoma
New Construction, Infrastructure
Post-Bid
$148,925,456 CJ est. value
Oklahoma City, OK 73145

Guymon 2022 Chip Seal
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Guymon, OK 73942

Guymon 2022 Chip Seal
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Guymon, OK 73942

Grade, Drain and Surface
Infrastructure
Post-Bid
$12,577,194 CJ est. value
Guymon, OK 73942

Grade, Drain and Surface
Infrastructure
Post-Bid
$12,577,194 CJ est. value
Guymon, OK 73942

Municipal Airport - City of Guymon
Infrastructure
Pending Verification
$180,000 CJ est. value
Guymon, OK 73942

Municipal Airport - City of Guymon
Infrastructure
Pending Verification
$180,000 CJ est. value
Guymon, OK 73942

REPLACE POLES IN OKLAHOMA PANHANDLE
Infrastructure
Design
Hooker, OK 73945

Grade, Drain, Surface and Erosion - US 54
Infrastructure
Results
$12,482,685 CJ est. value
Guymon, OK 73942

Grade, Drain, Surface and Erosion - US 54
Infrastructure
Results
$12,482,685 CJ est. value
Guymon, OK 73942

Utilities - US 64
Infrastructure
Design
$500,000 CJ est. value
Guymon, OK 73942

Resurface (Asphalt) - County Roads (NS-53/EW-31)
Infrastructure
Post-Bid
$1,990,036 CJ est. value
Texhoma, OK 73949

Resurface (Asphalt) - County Roads (NS-53/EW-31)
Infrastructure
Post-Bid
$1,990,036 CJ est. value
Texhoma, OK 73949

Last Updated 04/24/2023 02:02 AM
Project Title

Bridge and Approaches - SH094

Physical Address View project details and contacts
City, State (County) Hooker, OK 73945   (Texas County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $6,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Sh-94: Over the Beaver River, 3.1 Miles North of Jct Sh-3 Length 1.000 Mi. OKDOT - Bridge and Approaches - SH094 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents