Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Y--Station Service Replacement_Fl-Fg
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Dutch John, UT 84023

Salt Lake City International Airport National Weather Service Generator and UPS Replacement
Renovation
Sub-Bidding
$400,000 CJ est. value
Salt Lake City, UT 84116

Salt Lake City Community College (SLCC) Cate Field Lighting Upgrade II
Infrastructure
Sub-Bidding
$500,000 CJ est. value
West Jordan, UT 84088

Districtwide Electrical Services (High and Low Voltage)
Alteration
Post-Bid
Sandy, UT

PCC Improvements Concrete, Fence, Lights, Electrical
Alteration
Post-Bid
South Jordan, UT

2020 Holiday Light Installation and Removal
Results
South Jordan, UT 84095

Rushton Groundwater Treatment Plant General and Electrical Contractor Prequalification
Results
West Valley City, UT 84119

Z1da--(660)--Boiler Ups Backup Power Supply (Va-22-00028885)
Term Contract
Design
Salt Lake City, UT 84148

Emergency Generators
Alteration
Post-Bid
Herriman, Salt Lake City, West Jordan, UT 84081

Hunter High Baseball Scoreboard
Results
UT

Generator Load Bank Testing
Term Contract
Post-Bid
Salt Lake City, UT

J061--Electrical Switchgear Preventative Maintenance
Results
Salt Lake City, UT 84148

DFCM Construction - Pre-Qualification-General/Mechanical/Electrical/Roofing/Paving/Civil Contractors
Term Contract
Post-Bid

Students Event Center LED Retrofit
Term Contract
Results
$75,000 est. value
Salt Lake City, UT 84104

Last Updated 11/09/2022 05:33 PM
Project Title

Hydro Turbine Rehabilitation

Physical Address View project details and contacts
City, State (County) Sandy, UT 84093   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $793,298 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

22-23 Hydro Turbine Rehabilitation - Little Cottonwood Creek The work comprises the rehabilitation of two existing hydroelectric turbines installed in 1981 at Murray Power's hydroelectric facility. A turbine inspection report was prepared in May 2022 detailing conditions of the turbine and required work and includes disassembly of turbine components, refurbishment, and reassembly. Question Submission Close Date 9/29/2022 5:00 PM MDT

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents