Similar Projects
Treasure Island Elementary School Community Park - Construction - CP23-07 - North Bay Village
New Construction, Infrastructure
Conception
$2,703,546 CJ est. value
North Bay Village, FL 33141

Brownsville Transit Village Phase 5
New Construction, Infrastructure - 99,854 SF
Design
$45,000,000 CJ est. value
Miami, FL 33142

Brownsville Transit Village Phase 5
New Construction, Infrastructure - 99,854 SF
Design
$45,000,000 CJ est. value
Miami, FL 33142

Publix #1770 - Riviera Plaza / Coral Gables
New Construction, Infrastructure - 52,363 SF
Post-Bid
$10,000,000 CJ est. value
Coral Gables, FL 33146

Publix #1770 - Riviera Plaza / Coral Gables
New Construction, Infrastructure - 52,363 SF
Post-Bid
$10,000,000 CJ est. value
Coral Gables, FL 33146

Design-Build Services for Roadway Improvements to NE 2nd Avenue
Results
Less than $10,307,626 est. value
Miami, FL 33128

Doral Pedestrian Bridge Design Build
Results
Doral, FL

Uni Tower Mixed Use / Miami
New Construction, Infrastructure - 38,000 SF
Construction
$43,000,000 CJ est. value
Miami, FL 33132

Brickell Gateway Tower
New Construction, Infrastructure
Construction
$150,000 CJ est. value
Miami, FL 33130

Alton Bay Condominium Tower
New Construction, Infrastructure - 197,780 SF
Pending Verification
$10,000,000 CJ est. value
Miami Beach, FL 33140

Alton Bay Condominium Tower
New Construction, Infrastructure - 197,780 SF
Pending Verification
$10,000,000 CJ est. value
Miami Beach, FL 33140

M-Tower
New Construction, Infrastructure, Renovation - 10,531 SF
Design
$170,000,000 CJ est. value
Miami, FL 33130

Traffic Circle Improvements at SW 62 Avenue and SW 48 Street
Post-Bid
$318,000 est. value
Miami, FL 33134

72-Inch Water Main in West 2nd Avenue Between 11th Street and 13th Street
Results
Less than $8,142,405 est. value
Hialeah, FL 33010

Farmasi Cosmetics Office and Distribution Facility
New Construction, Infrastructure - 80,000 SF
Construction
$9,000,000 CJ est. value
Doral, FL 33172

Last Updated 01/06/2023 12:07 PM
Project Title

Improvements to South West 87 Avenue Bridge Over Canal C-100

Physical Address View project details and contacts
City, State (County) Miami, FL 33156   (Miami-Dade County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $2,901,819 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of August 15, 2022, the project has not yet been awarded. The anticipated date for award is not yet determined. Work under this Contract includes furnishing of all supervision, labor, materials, tools, equipment and performing all operations required to construct the Work in accordance with the Contract Documents. Work includes but is not limited to the following: A. Construction of the new bridge along SW 87 Ave over C-100 Canal. Broadway connecting the existing SW 87 Ave to the North and South of the proposed bridge with one travel lane, one dedicated bike lane with physical raised separation, Curb & Gutter, and sidewalk in both directions (Northbound, and Southbound). C. Roadway approach improvements to include, French Drainage, Storm Drainage System, Signing & Pavement Markings, Milling & Resurfacing guardrail installation, etc. D. Pedestrian lighting, landscaping, fencing. E. Will require close coordination with all utility stakeholders and Miami-Dade Water and Sewer Department throughout Construction. F. Particular close coordination with FPL for the relocation of the guidewire and transmission poles. G. Close coordination with Miami-Dade Water and Sewer Department will be required to keep in place the existing 48" water main along west side of proposed bridge. A. The location of work to be performed under the terms of this Contract shall be as follows: 1. From intersection SW 87 Ave & SW 164 St to intersection SW 87 Ave to SW 163 Terr B. The exact location and limits of construction are as shown on the Plans accompanying these Contract Documents.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents