Similar Projects
Buc-ee`s
New Construction - 50,000 SF
Conception
$50,000,000 est. value
Anderson, SC

Spinx Gas Station
New Construction
Conception
Moncks Corner, SC 29461

52 Station
New Construction
Design
Moncks Corner, SC 29430

Spinx #368
New Construction - 4,000 SF
Design
$500,000 to $1,000,000 CJ est. value
Charleston, SC 29414

Harris Teeter #368
New Construction - 75,040 SF
Bidding
$5,000,000 to $10,000,000 CJ est. value
Summerville, SC 29486

Circle K
New Construction - 9,808 SF
Bidding
$1,000,000 to $5,000,000 CJ est. value
Myrtle Beach, SC 29588

QuikTrip #1141
New Construction - 4,993 SF
Sub-Bidding
$1,000,000 to $5,000,000 CJ est. value
Simpsonville, SC 29680

Parker's Kitchen #81
New Construction - 4,922 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Moncks Corner, SC 29461

QuikTrip #1196
New Construction - 7,930 SF
Post-Bid
Graniteville, SC 29829

Murphy Express #8982
New Construction - 2,800 SF
Construction
West Columbia, SC 29169

Murphy Express #8935
New Construction - 2,800 SF
Construction
Columbia, SC 29204

Parker's Gas Station
New Construction - 9,300 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Beaufort, SC 29906

Kroger #448-01 - New Fuel Center
New Construction
Design
Columbia, SC 29229

7 Eleven #41875
New Construction - 3,470 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Murrells Inlet, SC 29576

Murphy Express #8905
New Construction - 2,800 SF
Construction
$1,000,000 est. value
Lexington, SC 29072

Last Updated 04/25/2022 06:56 AM
Project Title

Fueling Station Upfit Project

Physical Address View project details and contacts
City, State (County) Rock Hill, SC 29732   (York County)
Category(s) Commercial
Sub-Category(s) Gas Station
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work of this project consists of furnishing all labor, materials, equipment, tools, transportation, services and incidentals; and of performing all work necessary to complete all specified work.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Foodservice Shelving, Food Dispensing Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines.
Division 12 - Furnishings, Countertops, Rugs and Mats, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Liquid Fuel Distribution, Gasoline Distribution, Gasoline Piping, Gasoline Pumps, Diesel Fuel Distribution, Diesel Fuel Piping, Diesel Fuel Pumps, Fuel-Storage Tanks, Underground Fuel-Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents