Similar Projects
Courthouse Renovations
Renovation
Conception
NY

Construction Services for the 3rd Floor Repairs and Alterations Project
New Construction, Renovation
Bidding
White Plains, NY 10601

Town Court Alterations
Renovation
Bidding
Rochester, NY 14624

Fulton Highway Garage and Town Hall Renovation
Renovation - 19,440 SF
Post-Bid
Fulton, NY

Installation of Accessible Lift for the Town Hall
Post-Bid
$75,000 to $85,000 est. value
Schroon Lake, NY 12870

Court Room and Justice Court Office Renovation
Renovation
Results
Rensselaer, NY

Westport Town Hall Upgrades
Results
Westport, NY

Hall of Justice Courtroom Improvements
Construction
Rochester, NY 14614

Village Hall Renovations
Renovation
Post-Bid
Grand View-on-Hudson, NY 10960

Second Floor Renovations and HVAC Renovations
Renovation
Results
Waterford, NY 12188

Construction of a New Administration/Courthouse Building
New Construction
Post-Bid
Marcellus, NY 13108

ADA Bathroom, Ramps and Doors
Results
Tuxedo Park, NY 10987

Pirnie Fire Alarm Construction
- 93,646 SF
Post-Bid
$500,000 to $1,000,000 est. value
Utica, NY 13501

Village Hall Elevator
Results
Less than $1,000,000 est. value
Mount Kisco, NY 10549

Village Hall Elevator Modernization
Renovation
Post-Bid
Scarsdale, NY 10583

Last Updated 11/15/2021 04:08 PM
Project Title

Elevator Upgrades at City Hall Annex

Physical Address View project details and contacts
City, State (County) Yonkers, NY 10701   (Westchester County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

All labor, equipment, material and services required for the furnishing and installation of all elevator work as specified herein. Work shall include, but not be limited to, new controllers, hoist machines, hoist ropes, governors and governor ropes, cab enclosures, safeties (PE1 only), car and counterweight guides, buffers, car door operators, tracks, and hangers, hoistway door tracks, hangers and interlocks, door closers, hall button fixtures, directional lanterns, car operating panels, car top inspection stations and communications. Clean all car frames, car and counterweight rails, pit steel, hoistways and all other equipment being retained. Paint machine room floors, car frames and pit steel.

Details

Capitol/Court House/City Hall, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 14 - Conveying Equipment, Operation and Maintenance of Conveying Equipment, Operation and Maintenance of Elevators, Elevators, Elevator Equipment and Controls.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents