Similar Projects
Last Updated | 10/22/2020 10:13 AM |
Project Title | Bunny Run / Lonesome Dove Drainage Improvements |
Physical Address | View project details and contacts |
City, State (County) | Murphy, TX 75094 (Collin County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 to $1,200,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Construction of a water retention / spillway structure and outfall piping at Bunny Run; and the installation of 495 LF of various-sized Class III RCP with headwalls, and backfill at Lonesome Dove Park). This project generally consists of removal of existing concrete street and concrete headwalls, excavation of existing berm, construction of new earth berm and reinforced concrete outlet structure, construction of new concrete street, installation of new reinforced concrete pipes and box culverts, grouted rip rap erosion control, concrete headwalls, grading, sod, hydromulch and other miscellaneous related appurtenances for construction of the project. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |