Similar Projects
Reported | 01/12/2022 12:00 AM |
Project Title | Allard Avenue Reconstruction - Harper to Chester |
Physical Address | View project details and contacts |
City, State (County) | Grosse Pointe Woods, MI 48230 (Wayne County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | $1,050,000 |
Plans Available from | Municipal Agency - 12/14/21 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 0.34 mile of asphalt road reconstruction with concrete curb and gutter as well as storm sewer and other related work. This project includes asphalt patching and concrete joint repair at various locations in the city.The approximate quantities of major items of work involved in this project are as follows: Curb and Gutter, Conc, Det F2 3,800 Ft Aggregate Base, 11 inch 5,900 Syd HMA, 4E1 860 Ton HMA, 5E1 570 Ton Driveway, Nonreinf Conc, 6 inch 825 Syd Pavt, Rem 6,250 Syd HMA Surface, Rem 4,850 Syd Station Grading 19 Sta Pavt Joint and Crack Repr, Det 7, Special 4,000 Ft Underdrain, Subgrade, 4 inch 3,650 Ft Dr Structure, 48 inch dia 2 Ea Dr Structure, 36 inch dia 7 Ea Dr Structure, 24 inch dia 7 Ea Sewer, Cl IV, 12 inch, Tr Det B 325 Ft |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |