Similar Projects
AI Influent Pump Station Improvements
New Construction
Design
Less than $2,900,000 est. value
Saint Augustine, FL 32080

Lift Station V-03 Replacement
Renovation
Bidding
$1,690,000 est. value
Merritt Island, FL 32952

Utility Analysis Zone 108
New Construction, Infrastructure
Bidding
$540,038 est. value
Pompano Beach, FL 33060

Lift Station No. 6 Relocation and Collection System Improvements
Renovation
Post-Bid
Mulberry, FL 33860

Improvements To Lift Stations 393, 1023 And 8168
Renovation
Post-Bid
Belle Glade, West Palm Beach, FL

Replace Sewer Lift Station at USCG Station Panama City, Florida
Results
$250,000 to $500,000 est. value
Panama City, FL 32408

Detroit Boulevard Lift Station 50
Results
Less than $2,500,000 est. value
Pensacola, FL 32514

Effluent Disposal Project
Construction
Chipley, FL

Cedar Bay District II Pump Stations and Flow Rerouting Project - Robena Road
Construction
Jacksonville, FL 32218

Design-Build Services for Colony Cove Pipeline Replacements and Phase 1
Renovation
Bidding
$5,000,000 est. value
Jacksonville, FL 32260

Improvements to Master Repump Station 9-North WUD
Post-Bid
$3,200,000 est. value
West Palm Beach, FL

Lift Station #48 Rehabilitation and Force Main Replacement
Results
Less than $300,000 est. value
Cooper City, FL 33329

Rehab of LS 54 and LS 65
Renovation
Construction
Clearwater, FL 33759

Sanitary Pump Station Journey`s End Upgrade and New Force Main Project
Renovation
Bidding
Coral Gables, FL 33156

Long Avenue Water and Sewer Improvements
New Construction
Post-Bid
Less than $5,000,000 est. value
FL 32456

Reported 01/14/2022 12:00 AM
Project Title

Refurbish/Upgrade the Unit 2 Pump Station

Physical Address View project details and contacts
City, State (County) Apopka, FL 32704   (Orange County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $350,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this contract includes but is not limited to: remove and refurbish three (3) existing axial flow pumps, remove existing diesel power units, install new 1,200 amp service, install new 200 HP electric motors and all ancillary equipment associated with new motors, re-install refurbished pumps and conduct start-up. Work shall include all electrical and mechanical work necessary to make the system operational. The District is coordinating with Duke Energy to install a new transformer within 50-feet of the south side of the building.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents