Similar Projects
Revegetation, Storm Repair and Maintenance
Bidding
Chandler, AZ

M--La Posa Box Culvert and LWC Design / Construction
Post-Bid
Quartzsite, AZ 85346

Vistancia Boulevard Parcel H-22 Water and Sewer
Post-Bid
Peoria, AZ 85383

Nps - Lake Mead- Maintain/Clean Sewer Lines
Results
AZ

US 80 At Butterfield Wash Storm Water Protection
Results
Phoenix, AZ

Repair of Rock-Lined Stormwater Channels
Construction
AZ

Westward Skies
New Construction
Construction
Peoria, AZ

Madison Infrastructure Services
Post-Bid
Peoria, AZ 85345

Cadence School Offsite Infrastructure Improvements (CA160)
Results
$750,000 to $1,250,000 est. value
Mesa, AZ

Pecos Parcel - Water and Sewer
Construction
$60,000,000 est. value
Chandler, AZ 85226

Storm Drain Catch Basins
Term Contract
Post-Bid
AZ

Y--Haekel Rd San Simon Crossing Culvert
Results
$1,000,000 to $1,500,000 est. value
Safford, AZ

Northside Canal Siphon Inspection Rehabilitation and Lining Project
Post-Bid
Coolidge, AZ

Individual and Community Water and Sewer Facilities
Results
$250,000 to $500,000 est. value
Whiteriver, AZ 85941

Fairway Oaks/Chaparral Sewer
Post-Bid
Sedona, AZ

Reported 06/29/2019 12:00 AM
Project Title

Construction: Pipe Rail Rehabilitation

Physical Address View project details and contacts
City, State (County) AZ   (Maricopa County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description The location of the parking lot presents challenges in controlling storm runoff and sediment transport driven by Camp Creek after a storm event. The goal of this project is to reduce the maintenance by removing current and damaged sections of pipe rail fencing and replacing it with a more robust design and layout. Needle Rock Recreational Area is located on the Cave Creek Ranger District, Tonto National Forest. The site provides an access point to the Verde River that is heavily used by all recreational groups. The parking lot for the site is located at the confluence of the ephemeral Camp Creek and the Verde River. For this reason, the objectives of this project are to: A) Remove approximately 248 Linear Feet (LF) of existing and damaged sections of pipe rail; B) Replace the pipe rail with a new layout detailed in Appendix “A” of this document (Approximately 219 LF);
Details
Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents