Similar Projects
Hudson Tunnel Project
Conception
$11,300,000,000 est. value
New York, NY

Lake Suzanne Dam Rehabilitation Project
Renovation
Bidding
Spring Valley, NY

Mount Beacon Reservoir and Pocket Dam Rehabilitation
Renovation
Bidding
Beacon, NY

NYSEG Mill C Dam Facility Intake
Renovation
Post-Bid
Morrisonville, NY 12962

Spencer Lake Spillway Modification
Post-Bid
Owego, NY 13827

Village of Potsdam East Dam Hydro Rehabilitation
Term Contract
Results
Potsdam, NY 13676

Lake Casse, Upper Tea Kettle and Tea Kettle Dams Rehabilitation
Results
Mahopac, NY 10541

The Summit Center - Addition & Renovations
New Construction, Renovation, Addition - 16,500 SF
Construction
$2,000,000 to $2,300,000 est. value
Buffalo, NY 14228

Fallkill Dam Rehabilitation Project
Renovation
Bidding
Poughkeepsie, NY 12601

Erie Canal, Town of Frankfort Section, Site No. 622006
Renovation
Post-Bid
$5,000,000 to $10,000,000 est. value
Albany, NY

Olympic Center Revitalization - Phase 1 Tunnel
Results
Lake Placid, NY 12946

Hartford Levee Maintenance
Renovation, Term Contract
Post-Bid
Hartford, NY

Westside CSOAP Tunnel System Maplewood Siphon Improvements
Results
Rochester, NY 14614

May's Field Dam Removal
Results
Blooming Grove, NY 10914

Wilber Lake Dam Repairs and Improvements
Results
Oneonta, NY 13820

Last Updated 06/04/2021 09:00 AM
Project Title

Cooper Lake Dam Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Kingston, Woodstock, NY 12498   (Ulster County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of various improvements to Cooper Lake Dam and Water Supply Intake System. Major components of the project include: replacing the water supply intake piping, tower structure, valves and controls, and metering chamber; water supply system electrical upgrades; dam safety modifications including raising the crest of the Main Dam, flattening the downstream slope, installing internal filters and drains, and installing geotechnical instrumentation; replacing the principal spillway; and leveling the crest and flattening the upstream slope of the West Dike. The project also includes constructing permanent components of an emergency water supply connection between New York City’s Ashokan Reservoir and the Kingston Water Department’s Pre-treatment Facility on Sawkill Road, and, if so directed, installing temporary water supply piping and operating the temporary connection to provide emergency water supply to the Pre-treatment Facility if required during the Cooper Lake project. This project will utilize a Project Labor Agreement (PLA). As such, this project is exempted from the requirements of Wicks Law and therefore includes one (1) General Contract inclusive of all work items. All electrical work will be contracted and performed within the General Contract.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents