Similar Projects
Construction Manager at Risk - Army National Guard Readiness Center
New Construction - 83,100 SF
Design
Less than $22,500,000 est. value
Panama City, FL

Building 402 Renovation
Renovation
Design
$1,000,000 to $5,000,000 est. value
Patrick AFB, FL 32925

RFP D/B - Repair Expansion Joints in Building 55 Parking Garage
Renovation
Bidding
$500,000 CJ est. value
Tampa, FL 33612

RFP D/B - USSF D/B Construct Mezzanine SSB Facility B62630
Build-out, Renovation
Bidding
$1,000,000 CJ est. value
Cape Canaveral, FL 32920

Design and Construction of 325th Fighter Wing Headquarters, Tyndall AFB, Florida - Phase 2
New Construction - 29,548 SF
Post-Bid
$25,000,000 to $100,000,000 est. value
Panama City, FL 32403

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Design-Build and Design-Bid-Build Indefinite-Delivery/Indefinite Quantity Multiple Award Construction Contract for Jacksonville/Mayport/Orlando Areas N69450-20-R-0012
New Construction, Renovation, Demolition
Results
$150,000 to $99,000,000 est. value
Jacksonville, Mayport, Orlando, FL

Design-Build and Design-Bid-Build Indefinite-Delivery Indefinite-Quantity Multiple Award Construction Contract for Naval Facilities Engineering Command Southeast Area of Operations N69450-20-R-0097
Results
$20,000,000 to $100,000,000 est. value

CBJTC Cooper Hall Renovations
Renovation - 5,500 SF
Construction
Less than $850,000 est. value
Starke, FL 32091

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Maintenance and Operations Facility - City of Palm Coast
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Palm Coast, FL 32137

Flight Simulator Facility, Patrick Air Force Base, Florida
New Construction
Design
$10,000,000 to $25,000,000 est. value
Patrick AFB, FL

W9127821R0040 - Zone 9, Two-Phase Design Build Boat Marina and Recreation Facilities, Tyndall AFB, FL (Bay County, FL)
New Construction
Post-Bid
$25,000,000 to $100,000,000 est. value
Panama City, FL 32403

NAVFAC Intermodal Staging Area Repairs
Results
Jacksonville, FL 32226

RFP D/B - Two-Phase Design Build Zone 5 CE/Contracting/USACE Complex and Logistics Readiness Squadron Complex
New Construction, Infrastructure - 143,604 SF
Construction
$170,658,638 CJ est. value
Tyndall AFB, FL 32403

Last Updated 09/29/2022 12:34 PM
Project Title

B928 Applied Instruction Survival and Training Facility Renovations

Physical Address View project details and contacts
City, State (County) Jacksonville, FL 32202   (Duval County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $25,000,000 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

Project will upgrade or replace ventilation system, fire suppression system, pool building controls and install dehumidification unit to maintain pool water temperature, pool room temperature and humidity levels in pool area. Multiple areas will be renovated to improve overall training functionality. Building systems deficiencies will be corrected as part of this project. Facilities impacted by repair/construction will be in compliance with applicable ATFP, fire suppression, wind loading, flood elevation, seismic, accessibility, ASHRAE, and LEEDs codes and standards (as required) upon completion of the project. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC)- N69450-22-D-0002/0003/0004/0005/0006/0007/0008/0009 B928 ASTC Facility Renovations The estimated cost of construction for this project is between $10,000,000 and $25,000,000 period of performance of 340 calendar days. MBE (21.8%), WBE (6.9%) **All Site Visit participants must fill out the AMAG Base Access Form (Attachment E). Registration, proof of insurance and driver's licenses are required to obtain a station vehicle pass. Base Access Form (Attachment E) is due to Contract Specialist John Mack at john.e.mack5.civ@us.navy.mil and Contracting Officer at Lindsay Betteridge, at lindsay.e.betteridge.civ@us.navy.mil no later than Thursday, June 2, 2022 2:00 PM ET. Attendees must complete Attachment A, SECNAV 5512 and bring it with them to the Visitor Control Center. This will be required for entry on base.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents