Similar Projects
King County Job Order Contract
Term Contract
Design
Seattle, WA 98164

Fuel Station Inspection and Testing
Term Contract
Sub-Bidding
Kent, WA 98032

RFP - "Missing Middle" Housing Project
Term Contract
Sub-Bidding
Kenmore, WA 98028

Curb Management Plan
Infrastructure
Post-Bid
$150,000 to $225,000 est. value
Bellevue, WA 98007

Acceptance of Non Hazardous Fill (Pool Bid)
Alteration
Post-Bid
WA

Temporary Scaffolding Services
Term Contract
Results
WA

Rainier Community Center ADA Barrier Removal
Term Contract
Results
$1,277,240 est. value
Seattle, WA 98118

2022 Stormwater System Cleaning
Term Contract
Sub-Bidding
Lake Forest Park, WA 98155

Facilities Landscape Maintenance
Infrastructure
Post-Bid
$45,000 est. value
Sammamish, WA

Juvenile Detention Safety and Security Analysis
Term Contract
Sub-Bidding
Seattle, WA 98164

Parks Landscape Maintenance
Alteration
Post-Bid
$225,000 est. value
Sammamish, WA

Seattle-Tacoma Internal Airport Custodial Services Zone 4
Term Contract
Sub-Bidding
Seatac, WA 98188

City Hall HVAC Monitoring
Alteration
Post-Bid
$28,840 est. value
Sammamish, WA 98075

Janitorial Services Various Sites - West
Alteration
Post-Bid
Bellevue, WA

Light Rail Vehicle Electronic Suite Upgrade
Term Contract, Infrastructure, Alteration
Post-Bid
Seattle, WA

Last Updated 08/26/2022 09:32 AM
Project Title

Regulated Material Abatement (RMM) On-Call Portwide 2022-2 and 2022-3

Physical Address View project details and contacts
City, State (County) Seattle, WA 98164   (King County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Question Cut-off Date: Sep 8, 2022, 12:30:00 PM The Work Includes But Is Not Limited To The Following: Removal, Abatement, Cleanup, Encapsulation And Other Methods Of Managing Regulated Materials. Saw Cutting And Core Drilling Into Regulated Materials, And The Removal Of Regulated Materials During And After Such Activities. Regulated Materials Include But Are Not Limited To Asbestos, Lead Containing Paint, Pcb Caulking, Pcb And Non-pcb Light Ballasts, And Mold And Other Biological Hazards. Work Shall Be Performed On An On-call Basis At Various Airport And Seaport Locations Owned By The Port Of Seattle. The Areas May Also Include Projects Managed By The Port Of Seattle In Locations Not Directly Owned By The Port Of Seattle. The Contract Will Be Awarded For An Estimated Amount Not To Exceed $300,000, Which Includes Washington State Sales Tax. The Contractor Shall Furnish All Labor, Tools, Equipment, Materials And Incidentals Necessary To Perform The Work As Requested By The Port Of Seattle A Work Authorization. All Contractor Labor Shall Be Provided As Defined By The Labor Classifications Per The Schedule Of Unit Prices Listed In Document 00 41 00 - Bid Form. The Contract Will Last One (1) Year, 365 Calendar Days, From The Official Contract Award Date, Which Is The Date The Port Of Seattle Signs The Agreement, Or Until The Contract Amount Is Depleted, Whichever Comes First. This Contract Contains An Option To Extend The Contract Time Up To 12 Months Beyond The Original Contract Completion Date. Performance And Payment Bonds Will Be Required With The Contract. Each Bond Shall Be In The Full Amount Of The Contract Sum. No Bid Bond Is Required. Labor And Industries Require A "statement Of Intent To Pay Prevailing Wages" And "affidavit Of Wages Paid". The Expense Of Such Is The Responsibility Of The Contractor. If The Port Exercises Its Option To Extend The Contract An Additional Year, Then New Intents And Affidavits Will Be Required For The Additional Contract Year At The Prevailing Wage Rates Published At That Time. The Contract Rates Will Be Amended To Reflect The Changes In Prevailing Wage, If Any. The Port Reserves The Right To Reject Any And All Bids, To Waive Any Informality, To Accept Any Alternate Bids, And To Make Such Award That It Deems To Be In Its Best Interest And Pursuant To The Terms Of The General Conditions. Contract Time Extends From Execution Of The Contract Through Completion As Defined In The General Conditions. The Port Of Seattle Is An Equal Opportunity Employer And Encourages Disadvantaged Business Enterprises, Minority Business Enterprises, Women Business Enterprises And Small Business Enterprises To Participate In The Competitive Bidding Process.

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents