Similar Projects
Historic Miramar Infrastructure Improvements, Phase IV
Infrastructure
Bidding
$8,000,000 est. value
Miramar, FL

Pumping Services (Scheduled/Unscheduled)
Infrastructure
Bidding
$400,000 est. value
Fort Lauderdale, FL

Lyons Park Stormwater and Wastewater Improvements
Post-Bid
Pompano Beach, FL

Sanitary Sewer Lateral Connection and Lateral Pipe Product
Post-Bid
Plantation, FL

Commercial Boulevard Force Main Replacement Project
Results
Less than $350,000 est. value
Tamarac, FL 33321

Infiltration Removal Lateral and Mainline Lining Program
Term Contract
Results
Less than $3,169,282 est. value
Pembroke Pines, FL 33025

NE 22 Avenue Force Main Phase 2
Infrastructure
Post-Bid
$786,930 est. value
Lighthouse Point, FL 33064

Replacement of Hallandale Beach Force Main and Large User Meter Lum-07
Results
$2,171,973 est. value
Hollywood, FL 33022

Utility Analysis Zone 108
New Construction, Infrastructure
Post-Bid
$21,504,000 est. value
Pompano Beach, FL 33060

Cleaning, Televising, Grouting and Video Capture Services
Term Contract
Results
Fort Lauderdale, FL 33301

Pines Village Water Main Improvements Phase II and Septic Tank Conversion
Infrastructure
Post-Bid
$13,778,000 est. value
Pembroke Pines, FL

Rehabilitation of Sewer Manholes
Results
Miramar, FL 33023

Civil Work Related to Taft Street Force Main Wall Loss Verification
Infrastructure
Post-Bid
$400,000 est. value
Hollywood, FL 33019

Sanitary Sewer Collection System for District 2 Septic Tank Elimination Area 2-F
Infrastructure
Results
$2,570,829 est. value
FL

Emergency Installation & Repair Services For Water & Wastewater
Infrastructure
Post-Bid
$6,489,480 est. value
FL

Reported 04/08/2022 12:00 AM
Project Title

Sewer Clay Pipeline/Structural Lining

Physical Address View project details and contacts
City, State (County) Miramar, FL 33023   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To furnish all labor, materials, tools, and specialized equipment machinery, to perform Structural Lining using Cured -in-place pipe (CIPP) Technology to our Sewer Lateral Pipelines. In Basins 3 there are eight (8) inches in diameter of Clay Sewer pipelines which are severely deteriorated and needs to be Cured-in- place pipe (CIPP) lining which would avoid emergency dig-up in the residences’ backyards. Trenchless Sewer Rehabilitation remains a cost-effective way to address structural pipe defects, prevents root intrusion, and reduce infiltration. The length of this pipeline is approximately 800 feet. The selected contractor is responsible for the location of all underground lines, permits as applicable and all incidentals to complete the work.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents