Similar Projects
Windler Master Planned Community
New Construction - 1,900,000 SF
Conception
Aurora, CO

Deer Creek Villas
New Construction
Design
Littleton, CO

Metro Center - Master Plan
New Construction
Design
Aurora, CO 80012

2022 Alley Grading and Stabilization
Infrastructure, Alteration
Bidding
Englewood, CO 34223

2022 Alley Grading and Stabilization
Infrastructure, Alteration
Bidding
Englewood, CO 34223

Milliken Reservoir Slurry Wall D
Post-Bid
Greenwood Village, CO 80111

WD for Drilling Services at The Bonita Peak Mining District
Term Contract
Post-Bid
Silverton, CO 81433

2020 Alley Grading and Stabilization
Results
Englewood, CO 80110

BAFB Enclave Erosion Control
Results
Less than $400,000 est. value
Greenwood Village, CO 80112

Fitzsimons Village East - Mixed Use
New Construction - 549,315 SF
Construction
$105,000,000 est. value
Aurora, CO 80011

Cushing Skate Park
Renovation - 6,000 SF
Pending Verification
Englewood, CO 80110

Metro Center - Parcel A
New Construction
Design
Aurora, CO 80012

Big Sandy Park Improvements
New Construction
Post-Bid
Centennial, CO 80015

Veterans Memorial Cemetery - Stream and Pond
Results
Less than $800,000 est. value
Greenwood Village, CO 80112

Metro Center - Parcel B
New Construction
Design
Aurora, CO 80017

Reported 02/12/2022 12:00 AM
Project Title

Goldsmith Gulch Final Phase Improvements - Huntington-Caley Open Space

Physical Address View project details and contacts
City, State (County) Greenwood Village, CO 80111   (Arapahoe County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The scope and deliverables for the project include extensive earthwork and fine grading, an asphalt parking area, a playground, two steel shelters with swings, a structural retaining wall, concrete stepping stones and seat walls, concrete trail flatwork, irrigation and landscaping, and site drainage improvements.

Details

Park/Playground, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 11 - Equipment, Play Field Equipment and Structures, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents