Similar Projects
Carpet Supply and Installation as Needed
Alteration
Bidding
Long Branch, NJ

Stair Tread Replacement and Repair/Painting of Stairway Components
Alteration
Bidding
Hightstown, NJ

Flooring Replacement at 911 Columbia Avenue
Post-Bid
Millville, NJ 08332

Interlocking Floor Installation
Post-Bid
Pitman, NJ 08071

Z--Mechanical Rooms Floor Refurbishment
Results
$100,000 to $250,000 est. value
East Orange, NJ

Cherokee High School Stage Floor Renovations
Renovation
Results
$245,696 est. value
Marlton, NJ 08053

Somerset Arc Flooring Replacement
Post-Bid
Hillsborough, NJ 08844

Corridor Wall Floor Tile Upgrades at Verona High School
Results
$372,000 est. value
Verona, NJ 07044

Flooring Replacement at the Birchwood
Post-Bid
Perth Amboy, NJ 08862

Gymnasium Floor Replacement at Various Schools
Results
Englishtown, NJ 07726

Carpet Replacement for the McCowan Memorial Library
Post-Bid
Pitman, NJ 08071

Rubber Flooring Removal and Replacement at Norman A. Bleshman Regional School
Results
Less than $443,250 est. value
Paramus, NJ 07652

Polymer Flooring Work
- 7,110 SF
Post-Bid
Howell, NJ 07731

Replacement of Gymnasium 3 Floor at Ridgewood High School
Results
Ridgewood, NJ 07450

Wood Gym Floor Replacement at Barkalow Middle School
Post-Bid
Freehold, NJ 07728

Reported 08/13/2021 11:07 AM
Project Title

Building 300 Flooring Renovation Project

Physical Address View project details and contacts
City, State (County) Atlantic City, NJ   (Atlantic County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes the provision of all labor, materials, equipment and all incidental related work for the proposed area of scope approximately 25,500 square feet located on the first level of Building 300 within the Federal Aviation Administration (FAA) William J. Hughes Technical Center (WJHTC). The existing flooring throughout the first floor must be removed and properly disposed of in preparation for a new poured epoxy terrazzo flooring design. The quarry tile in the Cafeteria/ Kitchen/ Dining areas are not included in this scope of work and will be addressed in future projects. The Contractor is to ensure that the concrete slab is prepped and sealed for moisture barrier/isolation membrane prior to the installation of the new flooring. The flooring continues under an existing “Blue” Auditorium divider wall which will require the demolition of the wall and must be replaced with a proposed construction of a new feature wall. This new feature wall must be prepped ready with conduits and electrical wires and data cables/ for future Audio/Visual equipment installation. The existing electrical conduits in the floor will need to be removed and replaced with a pair of new conduits and cables. One conduit for electrical cables and the other conduit for the telecommunications cables per design. There will be one area that will get an additional conduit and cable for a fiber run for LabNet cables. Some special condition areas throughout the flooring project will need to be addressed such as the existing floor access panel to a manhole in the North hallway and other areas where items built over the flooring will need to be temporarily removed and reinstalled. A life safety study was performed which will require some additions and modifications to existing conditions in the building that will need to be corrected per ADA/ (Americans with Disabilities Act) requirements.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents