Similar Projects
Cleaning Redevelopment and Chemical Treatment of Gravel Packed Wells
Infrastructure
Results
Less than $85,000 est. value
Walpole, MA

Well 3A Submersible Pump and Motor Replacement
Results
$20,630 est. value
Needham, MA

Double Suction Pumps and Appurtenances
Infrastructure
Results
Boston, MA

Wells 3 and 4 Water Treatment Plant - General Bids
Results
$8,400,000 est. value
Medfield, MA 02052

Libbey Parkway Well Implementation - Filed Sub Bids
Infrastructure
Results
Weymouth, MA 02189

Well 2 Redevelopment and Inspection
Results
Less than $30,000 est. value
Needham, MA

Libbey Parkway Replacement Well Implementation - General Bids
Infrastructure
Results
Weymouth, MA

Drinking Water Supply Well Rehabilitation
Results
$45,000 est. value
Bellingham, MA

Replacement / Installation of a New Recycle Pump and Motor at the Water Treatment Plant
Infrastructure
Results
$24,292 est. value
Needham, MA

Engine 17 Prequalification
Infrastructure
Post-Bid
$17,200,000 est. value
Boston, MA

Peirce and Mann Halls Fire Pump, MSCBA Project - General Bids
Results
$125,000 est. value
Boston, MA

Wells 3 and 4 Water Treatment Plant - Filed Sub Bids
Renovation
Results
$8,400,000 est. value
Medfield, MA 02052

Provide Annual Well Cleaning and Reconditioning Services
Term Contract
Post-Bid
$100,000 to $150,000 est. value
Franklin, MA

Well Redevelopment and Repair Services Annual Program
Term Contract
Post-Bid
$300,000 est. value
Dedham, MA 02026

Well Station 4 Booster Pump System
Infrastructure
Results
Sharon, MA 02067

Reported 05/13/2022 12:00 AM
Project Title

Well and Pump Improvements

Physical Address View project details and contacts
City, State (County) Weymouth, MA   (Norfolk County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $170,000 [brand] Estimate
Plans Available from Civil Engineer - 04/27/22
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall consist of furnishing all labor, materials, tools, equipment, and incidentals required for the completion of the Well & Pump Improvement Project to be performed at the Arthur J. Bilodeau Water Treatment Plant and Mill River Wells. These improvements are summarized in Section 01010 and are depicted on the Contract Drawings, and include, but are not limited to mechanical process and electrical improvements to the existing Water Treatment Plant back wash water pump and motor, and drinking water supply wells and pumps.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents