Similar Projects
Western Multiple Award Task Order Contract (MATOC) for Horizontal Construction
Design
$2,000 to $4,000,000,000 est. value
Tucson, Yuma, AZ - El Centro, San Diego, CA

Pavement Rehabilitation
Infrastructure
Bidding
$21,650,000 est. value
AZ

FY22 Prop 101 Fog Seal Package 6
Infrastructure
Bidding
$1,000,000 to $5,000,000 est. value
Tucson, AZ

Gladden Farms Mike Etter Boulevard (North)
Post-Bid
Marana, AZ 85635

On-Call Asphalt Patching Services
Term Contract
Post-Bid
Sahuarita, AZ

Road Construction for the Pascua Yaqui Tribe PYT Tetakusim Improvement Project
Results
Tucson, AZ 85757

Pavement Rehabilitation
Results
Less than $21,640,000 est. value
AZ

Rocking K South Infrastructure
New Construction - 14,500 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Tucson, AZ 85747

Costco #407 Entry Drive Widening
Renovation
Construction
Tucson, AZ 85712

Fy22 Pavement Repair and Preservation Program High Volume and Low Volume Roadways Districts 1 and 3, Avra Valley and Catalina Mill and Pave
Infrastructure
Bidding
$6,000,000 to $7,000,000 est. value
AZ

High Water Crossing at Vamori Wash
Post-Bid
$10,000,000 to $20,000,000 est. value
Tucson, AZ 85746

Road Rehabilitation and Construction, for the Pascua Yaqui Tribe Los Reales Road Rehabilitation Project
Results
Tucson, AZ 85757

Sundial Reconstruction
Infrastructure
Bidding
Sahuarita, AZ

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Kolb Road: Sabino Canyon Road to Sunrise Drive
Results
$13,000,000 to $15,000,000 est. value
Tucson, AZ 85701

Reported 11/20/2021 12:00 AM
Project Title

FY22 Pavement Repair and Preservation Program High Volume and Low Volume Roadways District 1 Area B Mill and Pave

Physical Address View project details and contacts
City, State (County) AZ   (Pima County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $5,500,000 to $6,500,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of milling of existing asphalt and 2 overlay, also includes traffic striping, traffic control, and miscellaneous work as needed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents