Project Title | Cunard Street and Flint Street Water Main Project |
Physical Address | View project details and contacts |
City, State (County) | Cardington, OH 43315 (Morrow County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $803,577 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Cunard Street & Flint Street Water Main Project Each bid must contain the full names of the party or parties making the same, with an affidavit as to interested parties, and in the case of a corporation not chartered in Ohio, with a proper certificate that such corporation is authorized to do business in Ohio, and shall be accompanied by a Bid Guaranty Bond for the full amount (100%) of the Bid, in favor of the "Owner" or a certified check, cashier's check, or letter of credit pursuant to Chapter 1305 of the Ohio Revised Code, in the amount of 10% of the Bid, payable to the "Owner". It is agreed that the bid guaranty shall be for the benefit of the "Owner" pursuant to Section 153.54 of the Ohio Revised Code if the undersigned fails to execute the Contract in conformity with the Form of Contract incorporated in the contract documents and furnish Bond and insurance certificates within ten (10) days after the notification of the award of the Contract to the undersigned. Bids from contractors who are not on the Plan Holders List will be disqualified. The "Owner" reserves the right to reject any and all bids, to waive any informalities in the bids received, and to accept any bid which it deems most favorable. The "Owner" is an Equal Opportunity Employer and does not discriminate against the handicapped. Replacement of existing water main with 8" PVC watermain along Cunard Street & New Street. Installation of new 8" water main along Flint Street (Approx. total project length of 2030 FT) o Base Bid work includes: o Abandonment & removal of old water main o Installation of 8" and 12" PVC water main o Service line and valve replacement with contingency o Service meter pit installation (contingency) o 6" Fire hydrant replacement o Concrete walk o Drive apron replacement o Concrete pavement water main trench cap o Asphalt trench intermediate surface course o Site Restoration o Temporary potable water system 2022 Engineer Recommendation for Award 2022 Notice to Award to Contractor |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |