Similar Projects
Cathodic Protection Firms to Perform Repairs and Testing
Bidding
Bayville, NJ 08721

On-Call Electrical Services
Post-Bid
Little Egg Harbor, NJ

Bay Avenue Sanitary Sewer Pump Station Generator Replacement
Post-Bid
Manahawkin, NJ 08050

Electrician Services
Results
Bayville, NJ 08721

Miscellaneous Electrical Maintenance Work
Results
Island Heights, NJ 08732

General, Electrical, Plumbing, Building & Yard Emergency Services
Term Contract
Post-Bid

Extension for Energy Savings Improvement Program
Results
Bayville, NJ 08721

Electric Generation Service
Post-Bid
New Egypt, NJ 08533

Underground Utilities
Results
$100,000 to $250,000 est. value
Lakehurst, NJ 08641

Energy Savings Improvement Project at Multiple Schools
Post-Bid
Little Egg Harbor, NJ 08087

Electrical IDIQ
Results
$100,000 to $250,000 est. value
Lakehurst, NJ 08641

2020 Pavilion Restroom Electrical Material
Post-Bid
Barnegat Light, NJ 08006

Replacement of Two (2) Existing Automatic Voltage Regulators as Manufactured by Basler, or Equivalent
Results
NJ

Jackson Township School District ESIP Controls Upgrade
Post-Bid
Jackson, NJ 08527

Solar Power Purchase Agreement
Results
Jackson, NJ

Reported 02/06/2020 12:00 AM
Project Title

Install Cable Trays at JB-MDL

Physical Address View project details and contacts
City, State (County) Lakehurst, NJ 08641   (Ocean County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Original Set Aside: Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13). A contractor is sought to provide all personnel, equipment, tools, materials, supervision, and other items necessary to extend overhead cable trays and add additional circuits and pull down power cord reels at B678 located at Joint Base McGuire-Dix-Lakehurst, New Jersey with a performance time of 30 days after contract award. The Contractor shall provide all the necessary labor, equipment, materials, transportation, and supervision to meet all of the following requirements: - Contractor shall install approximately 200ft. of new cable trays/racks continuing off existing cable trays. (Cooper B-Line or equivalent) See attached sketch/drawing. - Contractor shall install approximately 14 pull down power cord reels with 30’ retractable cord with a 3 gang outlet on the end in proposed locations. See attached sketch/drawing. - Contractor shall install (2) 120/208v panels and circuit breakers to accommodate added circuits. New panels shall be installed approximately 40-50ft from existing main panel inside room. The existing main panel within the room shall be the source to energize newly installed panels. (Siemen’s or equivalent) Existing panels are Siemen’s. - Contractor shall install sixty three 20 Amp 4gang outlets in proposed locations. (See attached sketch). - Upon completion of the job contractor shall test voltages/phasing and assure all installed equipment is completely operational.

Details

Division 26 - Electrical, Common Work Results for Electrical, Cable Trays for Electrical Systems.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents