Similar Projects
Wastewater Treatment Plant
New Construction
Conception
$1,400,000 to $5,000,000 est. value
Alpine, TX

Phase 2 Wylie WTP Plant II Structural and Mechanical Improvements
Renovation
Bidding
$1,000,000 est. value
Wylie, TX 75098

Major Maintenance and Rehabilitation at Various Water Treatment Plants
Renovation
Bidding
$200,000 est. value
Dallas, TX

Pearland Surface Water Plant
Post-Bid
Less than $100,000,000 est. value
Pearland, TX 77853

John Hargrove Environmental Complex (JHEC) Waste Reclamation Facility (WRF) Expansion
Post-Bid
$60,000,000 est. value
Pearland, TX 77584

Barry Rose WRF Expansion
Results
Less than $60,000,000 est. value
Pearland, TX 77581

Water Well No.1 Rework and Water Plant Improvements 2020
Results
$626,000 est. value
Richmond, TX 77406

Peninsula Water Reclamation Plant - Phase III Expansion
Construction
$19,107,675 est. value
Lewisville, TX

East Side Water Treatment Plant Residuals Handling - Phase 1
Construction
$27,335,500 est. value
Sunnyvale, TX 75182

McLean Water Production Facility Rehabilitation
Renovation
Pending Verification
Pearland, TX

Liberty Water Production Facility Rehabilitation
Renovation
Pending Verification
Pearland, TX

Pearland Surface Water Treatment Plan Building Package
Post-Bid
Rosharon, TX 77583

Water Plant Improvements 2020
Results
$140,000 est. value
Pearland, TX 77584

Magnolia Water Production Facility Rehabilitation
Renovation
Pending Verification
Pearland, TX

LLWTP Filter 2 Repair
Post-Bid
Denton, TX 76205

Last Updated 05/06/2022 06:17 AM
Project Title

Freedom Park Groundwater Treatment System

Physical Address View project details and contacts
City, State (County) Angleton, TX 77515   (Brazoria County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,100,000 to $1,300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following: 1. Installation of new arsenic treatment system skid, backwash pump skid, and associated piping, valves, and appurtenances. 2. Electrical work associated with new equipment. 3. Construction of new concrete slab and canopy.

Details

Water Treatment Plant, New Construction.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents