Similar Projects
Crown Road 12" Loop - City of Willow Park
Infrastructure
Conception
$1,750,000 CJ est. value
Willow Park, TX 76087

Bay Hill Loop - City of Willow Park
Infrastructure
Conception
$575,000 CJ est. value
Willow Park, TX 76008

Heim BBQ / Hudson Oaks
New Construction, Infrastructure - 7,184 SF
Design
$800,000 CJ est. value
Hudson Oaks, TX 76087

Sherwin-Williams / Hudson Oaks
New Construction, Infrastructure - 4,500 SF
Design
$600,000 CJ est. value
Hudson Oaks, TX 76087

Interchange Improvement - IH 20
Infrastructure
Bidding
$57,955,584 CJ est. value
Weatherford, TX 76087

Springtown CDBG - Avenue D Reconstruction
Infrastructure
Post-Bid
$500,000 CJ est. value
Springtown, TX 76082

RFQ/P D/B - Design/Build of Parker County Elementary School District No- 1 - Fire Station No- 46 and No- 47
New Construction, Infrastructure
Post-Bid
$34,916 CJ est. value
Weatherford, TX 76088

Lift Station 26 Improvements
Renovation
Results
$2,146,000 est. value
Weatherford, TX

Clear Fork Interceptor
New Construction, Infrastructure
Results
$3,300,000 est. value
Aledo, TX

Elan Hudson Oaks
New Construction, Infrastructure - 53,900 SF
Construction
$41,000,000 CJ est. value
Hudson Oaks, TX 76087

Trinity Christian Academy Concessions and Locker Room
New Construction, Infrastructure - 5,973 SF
Construction
$600,000 CJ est. value
Willow Park, TX 76008

Dollar General / Millsap
New Construction, Infrastructure - 10,170 SF
Pending Verification
$750,000 CJ est. value
Millsap, TX 76066

Oykey Retail Center / Hudson Oaks
New Construction, Infrastructure - 12,780 SF
Pending Verification
$2,200,000 CJ est. value
Hudson Oaks, TX 76087

Russell Road Water Line - City of Willow Park
Infrastructure
Conception
$830,000 CJ est. value
Willow Park, TX 76087

Willow Park Medical Plaza 2
New Construction, Infrastructure - 46,000 SF
Design
$7,200,000 CJ est. value
Willow Park, TX 76087

Last Updated 04/02/2023 11:39 PM
Project Title

Water Treatment & Water Well for Kelly Ranch - Phase 1

Physical Address View project details and contacts
City, State (County) Willow Park, TX 76087   (Parker County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,200,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Cresson Crossroads Municipal Utility District No. 2 - Kelly Ranch Water Treatment & Water Well The deadline to ask questions is 1/13/2023 2:00 AM CST

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents