Similar Projects
Gridley Middle School Locker Room HVAC Replacement
Alteration
Bidding
$500,000 est. value
Tucson, AZ 85748

HVAC Contracting Services
Alteration
Bidding
Tucson, AZ

HVAC Replacement Agua Caliente Elementary School
Post-Bid
Tucson, AZ 85749

J041--Southern Arizona VA Healthcare System (SAVAHCS) Fisher House HVAC Control System Upgrade
Post-Bid
Tucson, AZ 85705

DEMA HVAC Duct Repair L4605 Silverbell Single
Results
Marana, AZ 85653

Oyama Elementary School Chiller Replacement Project
Results
Tucson, AZ 85713

Replacement Cooling Tower at Mount View High School
Alteration
Bidding
$300,000 est. value
Tucson, AZ 85742

Tucson Magnet High School Chiller 2 and 3 Replacement Project
Alteration
Post-Bid
Tucson, AZ

45--Saguaro National Park Requires The Replacement of HVAC
Results
Tucson, AZ 85748

HVAC Replacement Project
Alteration
Post-Bid
Tucson, AZ 85706

AC and Chiller Maintenance
Results
Coolidge, Oracle, San Carlos, AZ 85128

HVAC Maintenance, Repairs, and Replacement Services
Term Contract, Alteration
Post-Bid
$250,000 est. value
Tucson, AZ

Clean and Sanitize HVAC and Air Ducts
Term Contract
Results
Whiteriver, AZ 85941

Evaporative Cooling Equipment Maintenance, Repairs, and Replacement Services
Term Contract
Post-Bid
$250,000 est. value
Tucson, AZ

Santa Rita High School Chiller and Cooling Tower Replacement Project
Alteration
Results
Tucson, AZ 85730

Reported 07/09/2022 12:00 AM
Project Title

HVAC and VRF Replacement

Physical Address View project details and contacts
City, State (County) Tucson, AZ 85719   (Pima County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $100,000 to $250,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The United States Department of Agriculture (USDA) Agricultural Research Service (ARS) requires that all labor, supervision, tools, and materials be provided to replace four existing Bard A/C units & controls with one new combined variable refrigerant flow (VRF) system, including removing existing equipment, installing new equipment, electrical and control modifications.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents