Similar Projects
Airport Site Development
Infrastructure
Conception
Gulfport, MS

N. A. Sandifer Bridge Maintenance
Infrastructure
Design
$615,136 CJ est. value
Monticello, MS 39654

Choctaw County Schools: Football Stadium
Infrastructure
Design
$70,000 CJ est. value
Ackerman, MS 39735

Waveland Pole Barn Replacement - Rebid
Demolition, New Construction, Infrastructure
Bidding
$220,000 CJ est. value
Waveland, MS 39576

Warren County Jail Construction
New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
Vicksburg, MS 39183

Dollar General #24986 / Thyatira
New Construction, Infrastructure - 10,640 SF
Sub-Bidding
$2,000,000 CJ est. value
Senatobia, MS 38668

Chipotle #22006 / Madison
New Construction, Infrastructure - 2,325 SF
Sub-Bidding
$700,000 CJ est. value
Madison, MS 39110

Clock Tower (Rebid)
New Construction, Infrastructure
Post-Bid
$2,034,805 CJ est. value
Winona, MS 38967

Gateway Industrial Park Lot G and Mississippi Army National Guard Lot Site Development
Post-Bid
$980,000 est. value
Magnolia, MS

Weymouth Hall EWP Project - City of Natchez
Results
$150,098 est. value
Natchez, MS 39120

Loyd Star Attendance Center Drainage and Grading Improvements
Results
$125,160 est. value
Wesson, MS 39191

2021 Wastewater Improvements
Renovation, Infrastructure
Construction
$338,600 CJ est. value
Hickory, MS 39332

Jiffy Lube / D'iberville
New Construction, Infrastructure - 3,438 SF
Construction
$1,500,000 CJ est. value
Diberville, MS 39540

Abraham House of God
New Construction
Pending Verification
Horn Lake, MS 38637

Pleasant Gift Missionary Baptist Church Fellowship Hall
New Construction - 2,833 SF
Pending Verification
$500,000 to $1,000,000 CJ est. value
Jackson, MS 39209

Last Updated 09/30/2022 01:35 PM
Project Title

New Church Center for the Korean Church of Jackson Project

Physical Address View project details and contacts
City, State (County) Ridgeland, MS 39157   (Madison County)
Category(s) Heavy and Highway, Religious/Funeral
Sub-Category(s) Religious Facility, Site Development
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

All bids must be accompanied by bid security equal to five percent (5%) of the sum of the base bid and all alternates, and must be in the form of a certified check, cashier's check or a Bid Bond written by a company licensed to do business in Mississippi. The successful bidder will be required to furnish a bid security equal to five percent (5%) of the sum of the base bid and all alternates and must be in the form of a certified check, cashier's check or a Bid Bond written by a company licensed to do business in Mississippi. Liquidated damages will be assessed at $1,000.00 per day for each calendar day the work is not substantially complete. The successful bidder will be required to furnish a Performance and a Payment Bond written by a company licensed to do business in Mississippi, each in an amount equal to 100% of the contract amount. The Korean Church of Jackson reserves the right to reject any and all bids and to waive informalities, also to withhold the acceptance of any bid if approved, for thirty calendar days from the date bids are opened.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Ornamental Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties.
Division 11 - Equipment, Religious Equipment.
Division 12 - Furnishings, Religious Art, Specialty Casework, Religious Casework, Fixed Audience Seating, Pews and Benches.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents