Similar Projects
Last Updated | 07/12/2023 11:56 AM |
Project Title | Building L Make-up Air Unit Upgrade |
Physical Address | View project details and contacts |
City, State (County) | Palatine, IL 60067 (Cook County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | All Bids Received, Selection Underway, Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $114,000 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Work includes (but is not limited to) the following: 1.The removal of a hung gas-fired make-up air unit and replacement with a new gas-fired make-up air unit with new controls and integration with existing Tridium Niagara BAS. C.Lump sum bid proposals will be received for this project at the scheduled time of receipt of bids and will be publicly opened and read out aloud All bidders are encouraged to attend and sign-in at the meeting which will also be attended by the Owner and the Architect. A pre-bid walk through the area of work will take place immediately following the pre-bid meeting. .No bid may be withdrawn for a period of ninety days after the submission without the consent of the Board of Trustees. J.Any bid submitted unsealed, unsigned, fax transmission, e-mail, or received subsequent to the aforementioned date and time, may be disqualified and returned to the bidder. K.Harper College reserves the right to reject any or all bids or parts thereof, to waive any irregularities or informalities in bidding procedures, and to award the contract in a manner best serving the interest of the College. L.All bidders must comply with applicable Illinois Law requiring the payment of prevailing wages by all Contractors working on public works. Bidder must comply with the Illinois Statutory requirements regarding labor, including Equal Employment Opportunity Laws. M.Contractors shall pay not less than the prevailing rates of wages to all laborers, workmen, and mechanics performing work under this contract, and shall comply with the requirements of the Illinois Wages of Employees on Public Works Act (820 ILCS 130/1-12). N.Bidders shall comply with Business Enterprise Program: Participation and Utilization Plan developed by Harper College. There is a 30 percent (30%) aspirational goal on the contract. Additional digital copies of the construction documents shall also be available on compact disk from the printer at the cost of production to the printer upon deposit and pickup of a hard copy set of the construction documents. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |