Similar Projects
Williamstown Readiness Center - Rehabilitation - HVAC Construction
Alteration
Bidding
$400,000 to $500,000 est. value
Williamstown, PA

Coatesville Station HVAC
Alteration
Bidding
$100,000 to $199,999 est. value
Coatesville, PA

1168 Chiller Services
Term Contract
Post-Bid
Marienville, PA 16239

Radiator Covers
Post-Bid
$25,000 to $100,000 est. value
Philadelphia, PA

Air Filter
Results
Newtown, PA

Z--EISE Replace and Upgrade HVAC System
Results
$500,000 to $1,000,000 est. value
Gettysburg, PA 17325

Hartman Intermediate School Office/Multi-Purpose Room HVAC - HVAC Construction
Alteration
Bidding
Ellwood City, PA 16117

Rehabilitation of Building 19, Frick`s Lock Village Trailhead - Schuylkill River Trail - HVAC
Post-Bid
Pottstown, PA 19464

Construction of a New Warehouse - Heating and Ventilation Construction
Results
North East, PA 16428

North Side Primary School Air Conditioning/Boiler and Domestic Water Heater Warranty Rebuild - HVAC Construction
Alteration
Bidding
Ellwood City, PA 16117

HVAC Maintenance
Post-Bid
York, PA

Weyandt/Walsh Hall Replacement - HVAC
Results
Less than $16,598,000 est. value
Indiana, PA 15705

HVAC Contractors
Term Contract
Bidding
East Stroudsburg, PA

Chemically Flush Hot Water Heating System Johnstown, PA (PA051)
Post-Bid
Johnstown, PA

Sixth and Canal Pump Station Phase II Upgrade Project - Contract 2 - HVAC Construction
Results
$100,000 to $500,000 est. value
Reading, PA 19601

Reported 08/11/2021 12:00 AM
Project Title

Remove Existing and Installation of Two New Chillers

Physical Address View project details and contacts
City, State (County) Taylor, PA   (Lackawanna County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 07/20/21
Owner View project details and contacts
Architect View project details and contacts
Description

A. Remove existing chillers. B. Test/ analyze glycol levels in water loop. C. Install two new chillers. D. Install one new circulation pump. E. Equipment testing, calibration & commissioning.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents