Similar Projects
HPW - 66-Inch Water Line Interconnection Along W. Hardy Road from Beltway 8 to Greens Road
Bidding
$20,419,245 est. value
TX

Water Distribution, Sanitary Sewer, Drainage and Paving Facilities to Serve Jordan Ranch Street Dedication No. 6 and Jordan Ranch Section 22
Bidding
Houston, TX 77056

Oil Water Separator/Interceptor Maintanace and Disposal Services for the Fleet Management Department
Term Contract
Post-Bid
Houston, TX

Ditch Regrading and Reshaping at Various Locations PCT 2
Post-Bid
Houston, TX 77002

Sagemeadow UD - 16" Sanitary Replacement
Results
TX

Reclaimed Waterline
Results
Less than $350,000 est. value
Spring, TX

Chelford City Diversion Package 2
Bidding
$21,116,117 est. value
Houston, TX 77000

Construction of the Marvin Circle Paving and Water Line Improvements Project
Post-Bid
$275,000 to $300,000 est. value
Houston, TX

Construction of Imperial Forest Detention and Channel Improvements
Results
Less than $1,000,000 est. value
TX

2020 Shady Lake / Red Bluff Waterline Replacement Project
Bidding
Seabrook, TX 77586

Water, Sanitary, Force Main and Drainage Improvements for Becker Meadows Section 1
Post-Bid
TX

Exploration Green Detention Facility Phase 3A
Results
Less than $5,520,000 est. value
Clear Lake City, TX 77058

Aboveground and Underground Utility Location Service for the TXDOT Houston District
Term Contract
Bidding

Grease and Lint Trap, Wastewater Lift Stations, and Septic Tank Cleaning Services
Post-Bid
Houston, TX

Harvey Disaster Recovery Repairs in the Cypress Creek Watershed
Results
Less than $5,775,220 est. value
TX

Reported 02/23/2019 12:00 AM
Project Title

Construction of Water, Sewer, and Drainage Improvements Along First Park Drive

Physical Address View project details and contacts
City, State (County) TX   (Harris County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sanitary Sewers, Shoreline/Erosion/Drainage, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description Furnishing all labor, material and equipment and performing all work required for the construction of: Water, Sewer, and Drainage Improvements Along First Park Drive. The project is located near the intersection of Morton Ranch Road and Grand Parkway - SH99 (Harris County Key Map 445-Q).
Details
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents