Similar Projects
Brigham Road Apartments
New Construction, Infrastructure
Conception
$104,000,000 CJ est. value
Greensboro, NC 27409

Burlington Road Multi Residential Development
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
Whitsett, NC 27377

Old Battleground Road Apartment Complex
New Construction, Infrastructure
Design
$43,000,000 CJ est. value
Greensboro, NC 27410

High Point University Library
Demolition, New Construction, Infrastructure - 150,000 SF
Design
$80,000,000 CJ est. value
High Point, NC 27262

Battleground Avenue Self Storage
New Construction, Infrastructure - 90,750 SF
Bidding
$8,000,000 CJ est. value
Greensboro, NC 27408

Blair Park Golf Course Stormwater Improvements
Infrastructure
Bidding
$450,000 CJ est. value
High Point, NC 27260

RFQ Contractor - New Kiser Middle School - Phase III
New Construction, Infrastructure - 183,371 SF
Sub-Bidding
$55,000,000 CJ est. value
Greensboro, NC 27408

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Peeler Community Park Site Improvements and Renovations
Renovation
Post-Bid
Greensboro, NC 27405

Runway 23L Approach Clearing Project
Results
Greensboro, NC 27400

FMS-8 Office/Storage Building
Renovation, Demolition
Results
$1,590,000 est. value
High Point, NC 27260

Office Building
Renovation - 36,000 SF
Construction
$1,150,000 est. value
Greensboro, NC 27410

Keller Office
Renovation - 6,801 SF
Construction
Colfax, NC 27235

Bennett Farms
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Stokesdale, NC 27357

The Resurgent Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$60,000,000 CJ est. value
Greensboro, NC 27401

Last Updated 09/02/2022 02:11 PM
Project Title

Syngenta Crop Protection Headquarters Redevelopment

Physical Address View project details and contacts
City, State (County) Greensboro, NC 27409   (Guilford County)
Category(s) Commercial, Heavy and Highway, Laboratory
Sub-Category(s) Laboratory, Office, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $68,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the redevelopment of a 17 building, 70 acre campus. This includes the construction of a new office building that will connect to current lab facilities. As of September 2, 2022, an architect and construction manager-at-risk have been chosen. The project is multi-phased. The drawings are in construction documents phase in one portion and design development in the other two. A firm timeline has not been announced, however, it is expected to take 3 years to complete.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Rugs and Mats, Office Furniture, Institutional Furniture, Laboratory Furniture.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents