Similar Projects
Sewer Cleaning and Mapping
Post-Bid
Jekyll Island, GA

Annual On-Call Water and Sewer Emergency Repair
Term Contract
Post-Bid
Stockbridge, GA

Splost North Mainland Phase III Force Main Improvement
Results
Less than $2,800,000 est. value
Brunswick, GA 31520

Grease Trap Maintenance
Term Contract
Results
$11,130 est. value
Albany, GA 31702

Upper North Oconee (UNO) Interceptor Phase 2C
Post-Bid
Athens, GA

Septic Tank and Grease Trap Maintenance Services Countywide
Term Contract
Results
Atlanta, GA 30349

Grease Trap Services (Plant Services)
Post-Bid
Athens, GA

2019 CDBG Sanitary Sewer Improvements
Results
Less than $503,286 est. value
Vienna, GA 31092

Grease Trap Pumping
Post-Bid
GA

Sanitary Sewer System Improvements, 9th Street Area
Results
Vidalia, GA 30474

Installation of Water and Wastewater Infrastructure
Term Contract
Post-Bid
GA 31543

South Annexation - GEFA Phase III Infrastructure
Results
Richmond Hill, GA 31324

2021/2022 Camera Pipe Inspection Van
Infrastructure
Post-Bid
Augusta, GA

Ambercrest Sewer Extension
Results
Lawrenceville, GA 30046

FY 2021 Sanitary Sewer Improvements Project
Infrastructure
Post-Bid
Gainesville, GA

Last Updated 06/21/2022 01:19 AM
Project Title

2022 Stormwater Pipe Rehabilitation Project - CIPP Lining Method

Physical Address View project details and contacts
City, State (County) Peachtree City, GA   (Fayette County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $650,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the trenchless rehabilitation (CIPP Lining Method) of 5,854 LF of 15" to 30" diameter corrugated metal stormwater drainage pipe including 288 LF of 30" x 24" elliptical CMP. The selected pipes are located throughout the City. The City desires a fully structural liner at each project location and it will be the Contractors responsibility to determine liner thickness. The City has provided a table indicating the depth of pipe and is included as Attachment C. Groundwater is not known to be an issue at each project location. Work of the Project includes the trenchless rehabilitation (via the CIPP lining method) of 5,890 LF of 15 inch through 30 inch diameter corrugated metal stormwater pipe including 288 LF 30" x 24" elliptical CMP. The project shall be Substantially Complete within 90 calendar days ; The project shall be Final Complete within 30 calendar days beyond Substantial Completion

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents