Similar Projects
Glenvale Topsham Meadow Solar
New Construction, Infrastructure
Conception
$20,000,000 CJ est. value
Topsham, ME 04086

Central Maine Medical Center Ambulatory / Outpatient Surgery Center
New Construction, Infrastructure - 20,000 SF
Conception
$14,000,000 CJ est. value
Topsham, ME 04086

Topsham Lewiston Solar Power Generation
Infrastructure
Design
$2,000,000 CJ est. value
Topsham, ME 04086

$UPDATE PRESS - Mount Ararat High School - Arthur C. Dudley Construction
New Construction, Infrastructure
Design
$60,000,000 CJ est. value
Topsham, ME 04086

Arrowsic/Woolwich Max L. Wilder Memorial Bridge #2026 2023
Infrastructure
Bidding
$600,000 CJ est. value
Arrowsic, ME 04530

Arrowsic/Woolwich Max L. Wilder Memorial Bridge #2026 2023
Infrastructure
Bidding
$600,000 CJ est. value
Arrowsic, ME 04530

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Richmond Maintenance Facility Buildings
New Construction, Infrastructure - 4,000 SF
Post-Bid
$500,000 est. value
Richmond, ME 04357

Statewide Geotechnical Drilling
Infrastructure
Results

On Call Maintenance Paving
Infrastructure
Results

Compass Lane Self Storage
New Construction, Infrastructure - 16,400 SF
Construction
$1,800,000 CJ est. value
Topsham, ME 04086

Compass Lane Self Storage
New Construction, Infrastructure - 16,400 SF
Construction
$1,800,000 CJ est. value
Topsham, ME 04086

Eagle River Subdivision Phase 2
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Topsham, ME 04086

The Uptown
New Construction, Infrastructure, Renovation
Pending Verification
$17,000,000 CJ est. value
Bath, ME 04530

Union - Castine - Washington Sidewalks and Street Rehab (LAP) - 24- PW: 13 - City of Bath
Infrastructure
Conception
$450,000 CJ est. value
Bath, ME 04530

Last Updated 10/02/2023 11:34 AM
Project Title

Commercial Street Rehabilitation - 24- PW: 4 - City of Bath

Physical Address View project details and contacts
City, State (County) Bath, ME 04530   (Sagadahoc County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2025
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Commercial Street pavement is deteriorating; railroad tracks are showing through the pavement; there are gaps in the sidewalk network; conditions for cyclists are poor despite the fact this portion of road is part of the East Coast Greenway trail. The project may include improvements to cross streets Lambard, Broad, Arch, and Summer. As of October 2, 2023, this project is included in the City of Bath's 2024-2027 Capital Improvement Program (CIP) and funding allotted for FY 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents