Similar Projects
Annual Full Depth Reclamation
Post-Bid
Southaven, MS

Emergency Watershed Protection Program - 2020
Post-Bid
Hernando, MS

Mill, Overlay and Stripe Approximately 2 Miles on I-69 from the Concrete Section to Tennessee State Line
Results
MS

Hot Mix Asphalt Overlay on Various Roads
Results
$3,145,212 est. value
Hernando, MS

Emergency Watershed Protection Program - Apple Creek
Infrastructure
Post-Bid
Horn Lake, MS 38637

Road Widening
Results
$1,150,000 est. value
Hernando, MS

Slurry, Micro and Scrub Seal
Term Contract
Post-Bid
MS

Hot Mix Asphalt Patching
Term Contract
Results
MS

Mill and Overlay approximately 3 miles of SR 302 beginning East of Horn Lake Road to Interstate Boulevard
Infrastructure
Results
Hernando, MS 38632

2021 Street Paving Project
Infrastructure
Results
Olive Branch, MS

Amazon Transportation Improvements
Infrastructure
Results
Hernando, MS

Annual Bid for Culverts
Term Contract
Results
Hernando, MS

Asphalt Overlay Installation
Term Contract
Results
$1,353,762 est. value
Southaven, MS

Asphalt Paving and Milling Contract for Old Highway 51 and Motor Scooter Drive
Infrastructure
Results
$204,070 est. value
Hernando, MS 38632

Concrete Paving for Old Highway 51 and Motor Scooter Drive
Infrastructure
Results
$613,500 est. value
Hernando, MS 38632

Last Updated 01/04/2022 11:18 AM
Project Title

US Highway 51 and Kapik Drive Transportation Improvements

Physical Address View project details and contacts
City, State (County) Hernando, MS 38632   (DeSoto County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,114,285
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of /- 2400’ stretch of road centered about Kapik Dr to add turning lanes with curb, gutter, related storm drainage infrastructure, and traffic signal installation.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents