Similar Projects
Water Line Installation Fraternity Row
Infrastructure
Bidding
$100,000 to $500,000 est. value
College Park, MD 20740

Design-Build Contract with Guaranteed Maximum Price Underground Utilities Project
Post-Bid
Less than $5,000,000 est. value
College Park, MD 20742

Complete Dry-Barrel Fire Hydrants
Term Contract
Post-Bid
Laurel, MD 20707

Small Valves
Results
Laurel, MD 20707

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Granular Activated Carbon Filtration System Installation and Maintenance
Term Contract
Post-Bid
$500,000 to $1,000,000 est. value

Greenbelt Road 24-Inch Transmission Water Main Replacement
Results
MD

Task Order No. 77 - Riggs Road Water Main Replacement
Post-Bid
$1,000,001 to $2,500,000 est. value
Hyattsville, MD 20780

Marlboro Pike 16 Inch Water Main Replacement
Results
MD

Galvanized Pipe Replacement (RGH)
Post-Bid
Laurel, MD 20707

Edgewood Water Main Replacement
Results
Laurel, MD 20707

Wheeler Road Water Main Replacement
Infrastructure
Post-Bid
$1,000,001 to $2,500,000 est. value
Hillcrest Heights, Marlow Heights, MD

Saint Clair 16 Water Main Replacement
Results
MD

Solid Wedge Gate Valve
Infrastructure
Post-Bid
Laurel, MD

Patuxent Raw Water Pipeline Phase I and Phase II
Results
Less than $10,488,180 est. value
Laurel, MD 20707

Last Updated 07/02/2021 10:37 AM
Project Title

24-Inch Transmission Water Main

Physical Address View project details and contacts
City, State (County) Laurel, MD   (Prince Georges County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of 1, 961 linear feet of 24-inch water transmission, 142 linear feet of 16-inch water transmission, 33 linear feet of 14-inch water main, 24-inch and 16-inch Flow Control Valves, 24-inch and 16-inch plug valves and vault, two 24-inch and two 16-inch isolation valves and vaults, connection of 14-inch and 24-inch to PCCP, SCADA equipment and conduits, and appurtenances.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents