Similar Projects
River Wall Repair, Mechanics Park - ENG-FY23-011 - City of Biddeford
Infrastructure
Conception
$600,000 CJ est. value
Biddeford, ME 04005

Crosswalks/Lights/Sidewalks - Washington St - ENG-FY23-015 - City of Biddeford
Infrastructure
Conception
$624,000 CJ est. value
Biddeford, ME 04005

1 Diamond Mixed-Use
New Construction, Infrastructure - 84,000 SF
Design
$129,000,000 CJ est. value
Biddeford, ME 04005

Pearl Street Redevelopment
New Construction, Infrastructure
Design
Biddeford, ME 04005

Rice Public Library Childrens Garden Construction
Infrastructure
Bidding
$150,000 CJ est. value
Kittery, ME 03904

Town Pound Rock Wall Repair
Infrastructure
Bidding
$23,000 CJ est. value
Lebanon, ME 04027

Rachel Carson Multi-Purpose Facility
Addition, Demolition, New Construction, Renovation, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Kennebunk, ME 04043

RFP Engineering - State-Beech Active Transportation and Infrastructure Project (Eliot)
Infrastructure
Post-Bid
$200,000 CJ est. value
Eliot, ME 03903

Statewide Geotechnical Drilling
Infrastructure
Results

Horrigan Court Pump Station Upgrade
Renovation
Results
Biddeford, ME 04005

Joint National Guard Vehicle Maintenance Shop
LEED Certification, New Construction, Infrastructure
Construction
$24,692,742 CJ est. value
Saco, ME 04072

Cape Arundel Cottage Preserve Phase 6
New Construction, Infrastructure
Construction
$10,000,000 CJ est. value
Arundel, ME 04046

Eastview Village Condo Flats
New Construction, Infrastructure - 75,182 SF
Pending Verification
$20,000,000 CJ est. value
Saco, ME 04072

507 Main Street Multi-Tenant Commercial Building
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Saco, ME 04072

Harbor Access/Boat Launch - Vines Landing - ENG-FY23-017 - City of Biddeford
Infrastructure
Conception
$425,000 CJ est. value
Biddeford, ME 04005

Last Updated 09/12/2023 03:28 PM
Project Title

WWTF & PS Upgrades Project

Physical Address View project details and contacts
City, State (County) Old Orchard Beach, ME 04064   (York County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $24,200,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

NOTICE TO BIDDERS INVITATION TO BID Wastewater Treatment Facility and Pump Station Upgrades The Town of Old Orchard Beach, ME (Owner) will receive separate sealed Bids for upgrades to the existing Wastewater Treatment Facility (WWTF) and associated pump stations. The Work includes but not limited to new buildings, modifications to existing buildings, new process equipment, site work, plumbing and HVAC, electrical and controls, and all materials and equipment, services and construction inherent to the Work. The Project is financed in part by the Maine Department of Environmental Protection (DEP) Clean Water State Revolving Fund. Compliance with Agency requirements and Federal requirements is required, including but not limited to American Iron and Steel requirements as mandated by Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preferences. Any person interested in Bidding on this Contract should thoroughly familiarize themselves with the Clean Water State Revolving Fund Requirements. Failure to comply with any of the CWSRF conditions may result in the Bidder being determined non-responsive and therefore, not entitled to the award of this Contract. See Bidding Documents for full requirements. A Bid must be accompanied by Bid security made payable to Owner in an amount of 5% of Bidders maximum bid price and in the form of a certified check The goals for this project are a minimum of 0.64% certified Minority Business Enterprise (MBE) and a minimum of 1.64% certified Womens Business Enterprise (WBE) participation. The Work shall be substantially complete within 670 calendar days from the commencement of Contract Time and completed and ready for final payment within 730 calendar days from the commencement of Contract Time. The Owner anticipates that the Projects total bid price will be approximately $24.2M.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents