Similar Projects
Willow Lake Water Pollution Control Facility - South Secondary Clarifiers - 0000226 - City of Salem
Renovation, Infrastructure
Conception
$16,707,100 CJ est. value
Keizer, OR 97303

Columbia Boulevard Wastewater Treatment Plant(CBWTP) Outfall Surge Modifications - City Of Portland
Renovation
Conception
$950,000 CJ est. value
Portland, OR 97203

Ashland Wastewater Treatment Plant Step Screen and Wash Press - Hanover County
Renovation
Design
$610,000 CJ est. value
Ashland, OR 97520

Rockwood Water People's Utility District
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Portland, OR 97230

RFP D/B - Tri-City Water Resource Recovery Facility (WRRF) Outfall Project
Infrastructure
Post-Bid
$44,400,000 CJ est. value
Oregon City, OR 97045

Union Pacific Railroad (UPRR) IWTP Replacement - Albina Yard
New Construction
Post-Bid
$15,000,000 est. value
Portland, OR 97227

Wastewater Treatment Plant Headworks Screen
Renovation, Infrastructure
Results
$500,000 est. value
Bay City, OR

Hood River WWTP Digester Mixing System
Renovation, Infrastructure
Results
$2,972,000 CJ est. value
Hood River, OR 97031

Spies Independence Subdivision
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Independence, OR 97351

Park Place Crossing Master Plan
New Construction, Infrastructure
Pending Verification
$200,000,000 CJ est. value
Oregon City, OR 97045

Willow Lake Water Pollution Control Facility - South Primary Clarifier Improvements - 0000847 - City of Salem
Renovation
Conception
$2,000,000 CJ est. value
Keizer, OR 97303

Stormwater Quality Facilities - City of Milwaukie
New Construction, Infrastructure
Design
$1,279,000 CJ est. value
Milwaukie, OR 97222

WWTP Influent Flowmeter Project
Infrastructure
Post-Bid
$129,800 CJ est. value
Saint Helens, OR 97051

Headworks Screen Improvements - 2022
Infrastructure
Results
$397,670 CJ est. value
Union, OR 97883

Downs Tower SCADA Control Improvements - 0000621 - City of Salem
Renovation
Conception
$1,130,000 CJ est. value
Salem, OR 97301

Last Updated 10/18/2023 10:15 AM
Project Title

Willow Lake Water Pollution Control Facility Hydraulic Improvements

Physical Address View project details and contacts
City, State (County) Keizer, OR 97303   (Marion County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $2,908,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

WORK DESCRIPTION: The Work under this contract includes demolishing the existing Return Activated Sludge and South Primary Effluent flumes at the Aeration Mixing box, installing new magnetic flow meters, constructing a new 42-inch force main from the South Primary Pump Station to the Aeration Basin, and all necessary electrical and control connections for startup and commissioning. BID SECURITY: Bid security in the amount of 10 percent of the bid must accompany each bid in accordance with the Instructions to Bidders. NO LATE BIDS WILL BE ACCEPTED. Your bid must be uploaded prior to the Closing Date and Time. The City strongly recommends that you give yourself sufficient time and at least ONE (1) day before the closing date and time to begin the uploading process and to finalize your submission. The City accepts no responsibility for non-receipt and/or delays in receipt caused by transmission and reception problems, equipment failure, or any other similar cause. Each bid is instantly sealed and will only be visible to the City after the closing date and time. Uploading large documents may take significant time, depending on the size of the file(s) and your internet connection speed. Minimum system requirements: Internet Explorer 11, Microsoft Edge, Google Chrome, or Mozilla Firefox. Javascript must be enabled. Browser cookies must be enabled. Prevailing Wage Rates and necessary forms are available at website. BOLI Prevailing Wage Rates for Public Works Contracts in Oregon dated July 5, 2023, including all amendments issued prior to June 16, 2023. Please contact Equity Hub at help@equityhub.us or (267) 225-1407 for technical questions related to your submission. The Vendor Guide for Bid Locker can be found at Vendor Guide for Bid Locker. TECHNICAL QUESTIONS: Inquiries concerning the contents of the bid specifications should be directed to Kyler King, PE, Project Manager, at 503-588-6211. The City of Salem (City) reserves the right to reject any or all bids, to waive informalities, and to postpone the award of the contract for thirty (30) days.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents