Similar Projects
The Dairy Residential Subdivision
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Orchard Homes, MT 59804

South Avenue Improvements (Reserve to 36th) - S-19 - City of Missoula
New Construction, Infrastructure
Conception
$4,200,000 CJ est. value
Missoula, MT 59804

McCormick Park and Community Center - City of Missoula
Addition, Demolition, Infrastructure
Design
$27,000,000 CJ est. value
Missoula, MT 59801

Historical Museum at Fort Missoula Alien Detention Center Barracks
New Construction, Renovation, Infrastructure
Design
$691,100 CJ est. value
Missoula, MT 59804

Mullan Road at Chuck Wagon Drive Road Widening Improvements Project
Infrastructure
Post-Bid
$800,000 CJ est. value
Missoula, MT 59808

Bonner Bandshell Improvements 2023
Renovation, Infrastructure
Post-Bid
$200,000 CJ est. value
Missoula, MT 59801

McNamara Road Johnsrud McNamara Road
Infrastructure
Results
$6,519,114 CJ est. value
Missoula, MT 59802

Deice Apron Expansion
Infrastructure
Results
$7,476,583 CJ est. value
Missoula, MT 59808

Grant Creek Village
New Construction, Infrastructure
Construction
$190,000,000 CJ est. value
Missoula, MT 59808

National Museum of Forest Service History
LEED Certification, New Construction, Infrastructure - 30,000 SF
Pending Verification
$10,500,000 CJ est. value
Missoula, MT 59808

Mullan Road Reconstruction - City of Missoula
Infrastructure
Pending Verification
$13,000,000 CJ est. value
Missoula, MT 59808

Syringa Park Phase 2 - City of Missoula
Infrastructure
Conception
$336,000 CJ est. value
Missoula, MT 59802

Pontiac Commercial Development
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Missoula, MT 59808

RFP D/B - Procure/Install Playground Equipment and Fall Zone Material at Redfern Park
Infrastructure
Post-Bid
$300,000 CJ est. value
Missoula, MT 59808

Missoula Detention Center Parking Lot Expansion
Infrastructure
Results
$822,048 CJ est. value
Missoula, MT 59808

Last Updated 07/24/2023 09:39 AM
Project Title

St. Regis Sewer Force Main Replacement

Physical Address View project details and contacts
City, State (County) Missoula, MT 59802   (Missoula County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $225,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Site of the Work is Located in the Town of St. Regis, Montana on Either Side of the Clark Fork River. Along the West Side of the River, The Work Will Occur Along Two Rivers Road, Near the St. Regis Fishing Access Site. On the East Side of the River, the Work Will Occur Along Smith Ranch Road, Near the Intersection With Mill Creek Road. The Work Generally Includes the Replacement of A Damaged Sewer Force Main Crossing Under the Clark Fork River. The Project is Comprised Of Two Bid Schedules, One for General Work and One for Project Activities. The Project Work to Replace the Sewer Main Crossing Includes: Partial Removal of the Existing Sewer Force Main, Sanitation and Abandonment of the Remaining Portion Of the Existing Main, Temporary Sewage Transfer, Installation of A Sewer Force Main With 8" Dr9 Hpde via Directional Drilling and Trenching and 6" Dr11 Hdpe via Trenching, Installation of 2 Hdpe Transition Restraints, Installation Of 1 Automatic Air Release and Vacuum Valve, and Connection Of the New Main to the Existing System on Either Side of the River. The Project Also Includes: Installation of a 2" Pvc Gravity Sewer Service Line, Installation Of a 4" Pvc Sewer Service Stub, Temporary Gravel Road Construction, Gravel Road Patching, Asphalt Pavement Patching, Clearing and Grubbing Along Construction Areas, and Site Restoration. The Project is Funded By an Arpa Minimum Allocation Grant, Srf Loan, and the St. Regis Sewer District and is Subject to All Applicable State and Local Regulations as Indicated Within the Specifications. All Work Must Be Substantially Complete Within 90 Calendar Days After the Commencement Date Stated in The Notice to Proceed. Notice to Proceed is Flexible, With Completion Required by December 30th, 2023. The Contractor and Any of The Contractor's Subcontractors Doing Work on This Project Will Be Required to Obtain Registration With the Montana Department of Labor and Industry (Dli) Except As Listed in Mca 39-9-211. Information on Registration Can Be Obtained From the Dli by Calling 1-406-444-7734. The Contractor Is Required to Have Registered With the Dli Prior to Bidding on This Project. Each Bid or Proposal Must Be Accompanied by a Certified Check, Cashier's Check, Or Bid Bond Payable to the St. Regis Sewer District, in an Amount Not Less Than Ten Percent (10%) of the Total Amount of the Bid. Successful Bidders Shall Furnish an Approved Performance Bond and a Labor and Materials Payment Bond, Each in the Amount of One Hundred Percent (100%) of the Contract Amount. Insurance, as Required, Shall Be Provided by the Successful Bidder(S) and a Certificate(S) of That Insurance Shall Be Provided. Questions Regarding the Project Manual, Drawings, Details, or Specifications Shall Be Directed To the Engineer: Wgm Group, Inc. Michael Day, Pe at 1111 East Broadway, Missoula, Mt 59802, via Phone at (406) 728-4611 or Email at Mday@ Wgmgroup.com The St. Regis Sewer District (Project Owner) Reserves the Right to Waive Informalities, to Reject Any and All Bids, and, if All Bids Are Rejected, To Readvertise Under the Same or New Specifications, or to Make Such an Award as in the Judgment of Its Officials Best Meets The District's Requirements. Srf Loan Program is Funding The Project in Whole or in Part, Therefore Federal and State Laws Require That Each Employer Pay, as a Minimum, Prevailing Wages for Each Classification In Accordance With the Federal Labor Standards Provisions (Davis-bacon) or Montana Prevailing Wage Requirements, Whichever is Greater. A Copy of Said Wage Rates Are Included as Part of the Contract Documents. The Contractor Must Ensure That Employees and Applicants for Employment Are Not Discriminated Against on the Basis of Race, Ancestry, Color, Physical Or Mental Disability, Religion, National Origin, Sex, Age, Marital Or Familial Status, Creed, Ex-offender Status, Physical Condition, Political Belief, Public Assistance Status or Sexual Orientation, Gender Identity or Expression, Except Where These Criteria Are Reasonable Bona Fide Occupational Qualifications.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents