Similar Projects
Duchesne and Hawthorn Culvert Replacement
Infrastructure
Bidding
Saint Charles, MO

Central School Road and St. Peters- Howell Road Traffic Flow Improvements
Infrastructure
Bidding
Saint Peters, MO 63376

Swale and Culvert Work
Alteration
Post-Bid
Saint Peters, MO 63376

HDPE Pipe and Fittings for West Pearce Waterline
Infrastructure
Post-Bid
Wentzville, MO 63385

Sidewalk and Drainage Improvements
Infrastructure
Results
Saint Charles, MO

Town Vacuum System Canister Replacement
Infrastructure
Results
Saint Charles, MO

2022 Sewer Lateral Cleaning, Televising, and Emergency Repair
Infrastructure
Post-Bid
Lake Saint Louis, MO

HDPE for Interstate Drive
Infrastructure
Results
Wentzville, MO

Plastic Pipe Liner, HDPE Pipe, and Polypropylene
Infrastructure
Post-Bid
Saint Charles, MO

Laura Drive Drainage Improvements
Infrastructure
Results
$320,000 est. value
O Fallon, MO

North Cool Springs Precast Box
Infrastructure
Post-Bid
O'Fallon, MO 63366

2021 Bank Stabilization & Navigation Project (Bsnp) Structures Repair
Term Contract
Results

Maintenance Culvert Replacement
Infrastructure
Post-Bid
Weldon Spring, MO 63304

Crystal Springs Creek Bank Stabilization Project
Infrastructure
Results
Saint Charles, MO

370 Lakeside Park 2nd Entrance Embankment
New Construction
Results
Less than $75,000 est. value
Saint Peters, MO 63376

Last Updated 04/07/2022 01:45 PM
Project Title

Zumbehl Road Culvert Replacement Over Cole Creek

Physical Address View project details and contacts
City, State (County) Saint Charles, MO 63303   (Saint Charles County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will consist of replacement of existing corrugated metal pipe under Zumbehl Road with a 4 Cell 11 x 12 Reinforced Concrete Box Culvert. The project also includes pavement replacement, proposed 5 sidewalk and 10 trail, storm sewer work, fiber relocation, and water main replacement.

Details

Division 22 - Plumbing, Facility Storm Drainage.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents