Similar Projects
Joint and Crack Sealant
Infrastructure
Post-Bid
Wichita, KS

14th Street Improvements
Infrastructure
Post-Bid
Auburn, KS

2021 Street Resurfacing
Results
$3,500,000 to $4,200,000 est. value
Kansas City, KS

Road Construction, Moonlight Road
Results
KS

2021 Street Maintenance Program
Infrastructure
Post-Bid
Edgerton, KS

Road Construction, East of Mission Road
Results
KS

N1200 Road Improvements
Infrastructure
Post-Bid
Eudora, KS 66025

2021 Asphalt Overlay Program
Results
KS

Linear Grading, Reinforced Concrete Pipe, Subgrade Modification
Infrastructure, Alteration
Post-Bid
Eudora, KS 66025

Whispering Meadows Unit Seven, Sewer, Water, And Street Improvements
Results
KS

Mulberry Street Improvements
Infrastructure
Post-Bid
Valley Falls, KS

Mill and Overlay
Results
$831,421 est. value
KS

Hoover Road Multi-Use Path Phase 1 (Hoover and Zoo Signalization)
Infrastructure
Post-Bid
Wichita, KS

Chip and Seal
Results
$535,242 est. value
KS

K-14 Mill and Overlay
Infrastructure
Post-Bid
$310,000 est. value
Beloit, KS

Last Updated 03/30/2022 11:34 AM
Project Title

11th Avenue Reconstruction - Harsha Canal to Main Street

Physical Address View project details and contacts
City, State (County) Hutchinson, KS   (Reno County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed Work provides for the furnishing of all materials, equipment and labor for constructing the 11th Ave Reconstruction (Harsha Canal to Monroe St.) in the City of Hutchinson, Kansas, and consists of the following estimated quantities for sample units of work: • 30” Standard Curb & Gutter – 10,880 LF • 4” Concrete Sidewalk – 44,081 SF • 6” Concrete Entrance – 20,535 SF • 8” Concrete Entrance – 3,709 SF • Concrete Pavement (8” Uniform) – 8,902 SY • 8” Concrete Base – 19,513 SF • Storm Manhole – 4 EA • Type 22 Inlet – 20 EA • 2” Asphalt Milling – 12,574 SY • HMA Base (BM-2) – 3,084 Tons • HMA Surface (SR12.5A) – 1,027 Tons • HMA Overlay (SR12.5A) – 1,223 Tons Other Work includes Storm Sewers, Pavement Marking, Seeding & Mulching, Clearing and Grubbing, Erosion Control, Traffic Control, and Public Relations.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents