Similar Projects
Lake Huron Environmental Sciences Research Station - Saginaw Valley State University
New Construction, Infrastructure
Conception
$10,000,000 CJ est. value
Saginaw, MI 48604

Hemlock Public School District Middle School - Remaining 2022 Bond Work
Renovation, Infrastructure
Design
$5,000,000 CJ est. value
Hemlock, MI 48626

Hot Mix Asphalt Cold Milling and Resurfacing, Trenching, Sidewalk Ramp Upgrades and Pavement Markings
Infrastructure
Bidding
$2,000,000 CJ est. value
Saginaw, MI 48603

Guardrail Repair on Veterans Memorial Parkway
Infrastructure
Bidding
$1,000,000 CJ est. value
Saginaw, MI 48601

Hemlock Public Schools Bid Package #2 - KC Ling Elementary Gym Addition
Addition, Infrastructure - 60,740 SF
Sub-Bidding
$2,000,000 CJ est. value
Hemlock, MI 48626

Hemlock Public Schools Bid Package #2 - KC Ling Elementary Gym Addition
Addition, Infrastructure - 60,740 SF
Sub-Bidding
$2,000,000 CJ est. value
Hemlock, MI 48626

Swan Valley Schools - Shields And Havens Additions
Addition
Post-Bid
$1,500,000 est. value
Saginaw, MI

2 Elem School Remote/Portable Classrooms
Renovation
Post-Bid

Building and Site Improvement Plans - Save-A-Lot
Infrastructure
Results
Saginaw, MI 48601

Water Services Hydroexcavation
Infrastructure
Results
$130,500 est. value
MI

Shields Elementary School - 2021 Bond - Swan Valley School District
Renovation, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Saginaw, MI 48609

Shields Elementary School - 2021 Bond - Swan Valley School District
Renovation, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Saginaw, MI 48609

Saginaw Public Schools - New Handley Elementary School
New Construction
Post-Bid
Saginaw, MI 48602

Concrete Repairs on Primary Settling Tank #4 at Waste Water Treatment Plant
Infrastructure
Results
$98,800 CJ est. value
Saginaw, MI 48601

Havens Elementary School - 2021 Bond - Swan Valley School District
Renovation, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Saginaw, MI 48609

Last Updated 03/29/2023 11:19 AM
Project Title

Hemlock Public Schools Bid Package #1

Physical Address View project details and contacts
City, State (County) Hemlock, MI 48626   (Saginaw County)
Category(s) Education, Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Elementary School, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Hemlock Public Schools Bid Package #1 - KC Ling Elementary & Stadium Turf Project. Bid Divisions included on this project: 030100 - Concrete 050000 - Metals 060000 - General Trades 091000 - Drywall, Insulation & Acoustical 096500 - Flooring 099000 - Painting 222300 - Plumbing & HVAC Systems 260000 - Electrical 310000 - Site Work 321200 - Asphalt Paving 321800 - All Weather Synthetic Track Surface 321813 - Synthetic Turf . Furnish and install the complete under drainage system. This contractor to furnish and install all storm water drainage work under the turf field. Refer to keynotes 13,19 and 25. All other storm water drainage work will be the responsibility of the site work bid division. The two bid divisions will need to coordinate prior to the work starting. . Furnish and install synthetic turf to all storm structure covers . Provide reference for installed fields upon request. . Provide warranties per specification minimum (8) eight years from date of Substantial Completion. . Furnish extra materials per spec, 500 lbs of rubber granules, 15 'xlO" of turf. . Furnish and install complete operational drainage system into storm basins. . Furnish and install complete turf system. . Furnish and install all rubber infill material. . Provide all field markings. . Provide school district with one pull behind drag brush. . Remove and replace any damaged misaligned materials caused by this Bid Division contractor. . Complete and submit special project guarantee. . Furnish and install specified combination goal posts. . Provide all geo textile fabric. Please contact Donna Ratzlaff at - donna.ratzlaff@wolgast.com for documents and further information. Locations - K.C. Ling Elementary School - 835 N Pine St, Hemlock, MI 48626, Hemlock Public School - 200 Wilson St, Hemlock, MI 48626 Addendum #1-#3 have been issued as of 1-17-2023.

Details

149,885 SF.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Earth Moving, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents