Similar Projects
Edward's Auto Fuel Station/Convenience Store
New Construction, Infrastructure
Conception
$400,000 CJ est. value
Charlton, MA 01507

Corrosion Materials Expansion
Addition, Demolition, Infrastructure
Conception
$1,000,000 CJ est. value
Auburn, MA 01501

Salisbury Street Multi-Residential Development
Demolition, New Construction, Infrastructure
Design
$40,000,000 CJ est. value
Worcester, MA 01609

Millbury St Apartment Addition
Addition, Demolition, Renovation, Infrastructure
Design
$4,000,000 CJ est. value
Worcester, MA 01610

Mulcahy Field Improvements - Phase II / Department of Public Works and Parks (DPWP)
Infrastructure
Bidding
$250,000 CJ est. value
Worcester, MA 01604

Hecla Street Basketball Courts Reconstruction
Infrastructure
Bidding
$130,000 CJ est. value
Uxbridge, MA 01569

RFQ D/B - Hopkinton-Westborough - Interchange Improvements, Interstate 495 (NB and SB) at Interstate 90 (EB and WB)
Infrastructure
Post-Bid
$339,185,107 CJ est. value
Hopkinton, MA 01748

Construction of Skatepark and Pump Track
New Construction, Infrastructure
Post-Bid
$500,000 est. value
Leominster, MA

Hemlock Street, Proctor Street and Bridle Path Pump Stations Replacement - General Bids
New Construction
Results
$2,631,538 est. value
Worcester, MA 01606

Excavation and Paving Services
Term Contract, Infrastructure
Results
$100,000 est. value
Worcester, MA

Shrewsbury Maple Retail Office
New Construction, Addition - 2,000 SF
Construction
Shrewsbury, MA 01545

Auburn Commerce Park Site Development
New Construction
Construction
Auburn, MA 01501

Salisbury Pine Tree Estates
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Holden, MA 01520

Banner Self Storage
New Construction, Infrastructure - 127,000 SF
Pending Verification
$15,000,000 CJ est. value
Worcester, MA 01606

Town of Northborough Fire Station
Demolition, New Construction, Infrastructure - 22,946 SF
Conception
$18,800,000 CJ est. value
Northborough, MA 01532

Last Updated 12/22/2022 09:03 AM
Project Title

Wachusett Dam Lower Gatehouse Pipe and Boiler Replacement - General Bid

Physical Address View project details and contacts
City, State (County) Clinton, MA 01510   (Worcester County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Dam/Tunnel, Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $19,333,573 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes, but is not limited to, the following: furnishing all labor, materials and equipment to demolish existing pip- ing in Well No. 2, 3 and 4, modifications to existing pipe layout, installation of new isolation and flow control valves, includ- ing electrical/instrumentation; improve- ments to the fountain line, installation of a new access platform, boiler replace- ment, and hazardous material abatement at the Wachusett Dam Lower Gatehouse. Each General Bid must be accompanied by a current Certificate of Eligibility issued by the Division of Capital Asset Management and Maintenance (DCAMM) showing that the bidder has the classification and capac- ity rating to perform the Work and an Up- date Statement. In order to be eligible to bid, a General Bidder must be certified in the following category of work: Sewage and Water Treatment Plants or Mechanical Systems Each Filed Sub-Bid must be accompanied by a current Certificate of Eligibility issued by DCAMM showing that the Sub-Bidder has been certified to participate on public construction projects and perform the class of work for which the Sub-Bid is submit- ted. Each Filed Sub-Bid must also be ac- companied with an Update Statement. Filed Sub-Bids will be required on the following classes of work: Division Sub-trades 5 Miscellaneous and Ornamental Iron 9 Painting 15 Plumbing 15 Heating, Ventilating & Air-Condition- ing 16 Electrical Work This contract is subject to a 7.24% MBE and a 3.6% WBE participation requirement. Q And A Open: 09/02/2022 12:30:01 AM Q And A Close: 09/10/2022 02:30:00 AM

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents