Similar Projects
Fire Station #4 Construction
New Construction, Infrastructure
Post-Bid
$5,975,000 CJ est. value
Branson, MO 65616

Compton Wastewater Treatment Plant Flood Protection Wall - City of Branson
Infrastructure
Post-Bid
$2,599,000 CJ est. value
Branson, MO 65616

Water Meter Replacements
Infrastructure
Results
$500,000 CJ est. value
Branson, MO 65616

Replace 22 Electric Sites with 22 Premium Sites Table Rock State Park, Campground #2
Infrastructure
Results
$1,421,190 CJ est. value
Branson, MO 65616

The Ridge at Table Rock Lake
New Construction, Infrastructure
Pending Verification
$75,000,000 CJ est. value
Branson, MO 65615

Donnelly Ridge
New Construction, Infrastructure
Pending Verification
$18,105,600 CJ est. value
Branson, MO 65616

Woodland II Apartments
New Construction, Infrastructure
Post-Bid
$6,000,000 CJ est. value
Forsyth, MO 65653

Table Rock State Park RTP Trail Paving Project
Infrastructure
Post-Bid
$700,000 CJ est. value
Branson, MO 65616

Electric Vehicle (EV) Charging Stations
Infrastructure
Post-Bid
$30,000 CJ est. value
Branson, MO 65616

Great Escapes RV Resort / Forsyth
New Construction, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Forsyth, MO 65653

Asphalt Paving , Sealcoat and Striping
Infrastructure
Post-Bid
$225,000 CJ est. value
Hollister, MO 65672

The Cliffs at Long Creek Phase 3
New Construction, Infrastructure
Post-Bid
$200,000 CJ est. value
Ridgedale, MO 65739

Branson High School Tennis Court Addition
Infrastructure
Post-Bid
$35,000 CJ est. value
Branson, MO 65616

Fire Station #4 Construction
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Branson, MO 65616

Replace Five Basic Sites with Five Premium Yurts Table Rock State Park
Infrastructure
Post-Bid
$300,000 CJ est. value
Branson, MO 65616

Last Updated 05/09/2023 03:23 PM
Project Title

Compton WWTP Flood Protection Wall Construction

Physical Address View project details and contacts
City, State (County) Branson, MO 65616   (Taney County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storm/Sewers
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $1,080,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

EDA AWARD NUMBER 05-79-06045 CDBG AWARD NUMBER 19-LTR-06; 18-DP-MIT01 Bids will only be accepted from prime bidders represented on PreBid Meeting sign-in sheet. Bidder questions shall be submitted in writing two business days prior to the PreBid meeting. These items will be addressed as needed during the meeting. Meeting minutes will be provided to all meeting attendants A new screen will appear for Open Bids. Plans and specifications may also be examined at the office of the City Engineer at City Hall, 110 W. Maddux, Branson, Missouri 65616, (417) 337-8559. Bids will be received on a lump sum and unit price basis. Each bidder shall submit with his bid a cashier's check, certified check or bidder's bond for 5 percent (5%) of the total amount of the base bid made payable to the City of Branson, Missouri, hereinafter referred to as the Owner. Electronic bid bonds may be uploaded with the bid submission or submitted by using partners, Surety 2000 or Surety Wave. Cashier's check or certified check shall be submitted to the address below and must be received prior to the bid opening date. Clearly mark outside of envelope as follows:

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents