Similar Projects
SR 145 - Slide Correction
Infrastructure
Conception
$327,000 CJ est. value
Birdseye, IN 47513

SR 145 - Slide Correction
Infrastructure
Conception
$327,000 CJ est. value
Birdseye, IN 47513

Asphalt Resurface - SR 164
Infrastructure
Bidding
$2,111,270 CJ est. value
Saint Anthony, IN 47575

Asphalt Resurface - SR 164
Infrastructure
Bidding
$2,111,270 CJ est. value
Saint Anthony, IN 47575

HRJ Ln/Power Dr Reconstruction Project
Infrastructure
Post-Bid
$1,100,000 CJ est. value
Jasper, IN 47549

HRJ Ln/Power Dr Reconstruction Project
Infrastructure
Post-Bid
$1,100,000 CJ est. value
Jasper, IN 47549

West 1st Street Phase II A
Infrastructure
Results
Huntingburg, IN 47542

Portions of County Road Improvements
Infrastructure
Results
Jasper, IN

RFP Engineering - Project Development Services
Infrastructure
Pending Verification
$22,846,022 CJ est. value
Saint Anthony, IN 47575

RFP Engineering - Project Development Services
Infrastructure
Pending Verification
$22,846,022 CJ est. value
Saint Anthony, IN 47575

Micro-surfacing of Selected Streets
Infrastructure
Bidding
$599,000 CJ est. value
Jasper, IN 47546

Road Improvements to Portions of 1100 South & Kellerville Road
Infrastructure
Post-Bid
$1,400,000 CJ est. value
Jasper, IN 47546

Portions of County Road Improvements
Infrastructure
Results
Jasper, IN

Hoosier Hills Marina AST Installation
Infrastructure
Bidding
Celestine, IN 47521

Ferdinand Streets CCMG 2023-1 Project
Infrastructure
Post-Bid
$376,000 CJ est. value
Ferdinand, IN 47532

Last Updated 06/26/2023 10:09 AM
Project Title

Main Street Parking Lot Phase 2

Physical Address View project details and contacts
City, State (County) Huntingburg, IN 47542   (Dubois County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Each Bid must be enclosed in a sealed envelope bearing the title "Main Street Parking Lot - Phase 2" and the name and address of Bidder. The project consists of site grading, sanitary sewer main and lateral installation, grout filling of the existing sanitary mainline and manhole in place, parking lot agg. base and paving, retaining wall, sidewalks, curb, and two Class III INDOT drives. The contract documents, consisting of advertisement for bids, information for bidders, bid, bid bond, agreement, general conditions, supplementatry conditions, payment bond, performance bond, notice of award, notice to proceed, change order, drawings, specifications and addenda, may be examined on or after tuesday, june 6, 2023 at the following locations: cash waggner & associates, pc, 402 e 13th street, suite 101, jasper, in 47546 city of huntingburg clerk-treasurer, 508 e. Fourth street, huntingburg, in 47542. The OWNER reserves the right to waive any informality or to reject any and all bids. Award will be made to the low, responsive, responsible bidder. No proposal may be withdrawn after the scheduled closing time for receipt of bids for at least sixty (60) days. This check or bond will be held by the owner as evidence that the bidder will, if awarded the contract, enter into the same with the owner upon notification from him to do so within ten (10) days of said notification. If contract is $200,000 or greater, contractor receiving award in full force and effect throughout the term of the construction project plus a period of twelve (12) months from the date of the substantial completion. Bonds shall be furnished at time of notice to proceed of contract. Each BIDDER must complete and submit with BID Indiana Form 96 inclusive of Non-Collusion Affidavit Standard Questionnaire and Financial Statement and other required documents as required by Indiana law. A Pre-bid conference will not be conducted for this project. Representatives of the Owner and Engineer will be available to discuss the project via phone. Engineer will transmit to all prospective Bidders of record such Addenda as Engineer considers necessary in response to questions arising during the bidding process. Oral statements may not be relied upon and will not be binding or legally effective. A pre-bid conference will not be conducted for this Project.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents