Similar Projects
RFQ - 2022-2027 On-Call Consultants for General Architectural Services
Term Contract
Bidding
Salinas, CA 93901

RFP Design - Approved ADU Building Plans
Term Contract
Bidding
Marina, CA 93933

A-E IDIQ Surveying and Mapping
New Construction, Term Contract
Post-Bid
$10,000,000 est. value

C1da--Visn 21 Design A/E IDIQ 2022-2027
New Construction
Post-Bid

FAA Airport Traffic Control Tower Design Competition
New Construction
Results

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Post-Bid
Less than $98,000,000 est. value

Pre-Approved Accessory Dwelling Unit (ADU) Plan Designs
New Construction, Alteration
Post-Bid
Salinas, CA

Architectural and Engineering Professional Services
Term Contract
Post-Bid
$50,000 to $100,000 est. value

Architectural, Engineering, Project Management and Other Professional Services
New Construction, Term Contract, Infrastructure
Post-Bid
Carmel-by-the-Sea, CA

Engineering - Pacific Grove Manholes Rehabilitation Project Design
Renovation, Alteration
Post-Bid
$950,000 est. value
Pacific Grove, CA

Professional Services to Conduct Environmental Review for the Pacific Grove 6th Cycle Housing Element / 2023-2031 and Associated General Plan Elements
Renovation, Infrastructure
Post-Bid
Pacific Grove, CA

Design - Madera County Manzanita Regional Park Project
Renovation, Infrastructure
Post-Bid
$1,662,500 est. value
Prunedale, CA 93907

Preparation of Objective Design Standards
New Construction, Alteration
Post-Bid
Marina, CA

RFP - Feasibility Analysis of the Monterey Microgrid and Renewable Energy Projects
Term Contract
Post-Bid
Monterey, CA 93940

RFP Design - Professional Architectural and Engineering Services for Fire Station No. 2
New Construction, Infrastructure
Post-Bid
$3,000,000 CJ est. value
Seaside, CA 93955

Last Updated 06/15/2023 06:35 PM
Project Title

Wastewater Treatment Plant (WWTP) Upgrade - City of Greenfield

Physical Address View project details and contacts
City, State (County) Greenfield, CA 93927   (Monterey County)
Category(s) Professional Services
Sub-Category(s) Architectural
Contracting Method Competitive Bids
Project Status Design Development, Request for Qualifications, Construction start expected August 2024
Bids Due View project details and contacts
Estimated Value $91,000,000 [brand] Estimate
Plans Available from Consultant
Owner View project details and contacts
Architect View project details and contacts
Description

Per the project contact, as of June 15, 2023, the current schedule for award of the construction contract is in the third quarter of 2024. The general contractor will be selected by a public bidding process in the third quarter of 2024. Closed solicitation has been included below for reference. ……………….. Consultants must direct all inquiries to the City in writing, via email to Tony Nisich, P.E. tnisich@mnsengineers.com. All inquiries will be responded to in writing, and questions and responses will be disseminated to all consultant teams for their consideration. The origination of the questions will not be disclosed. All inquiries must be received no later than Thursday, July 14, 2022 at 5pm in order to receive responses from the City. The City owns and operates the wastewater collection, treatment, and disposal facilities that serve a population of approximately 17,700 residents. The collection system has nearly 4,000 sewer connections, most of which are residential. There are about 150 commercial connections and around ten industrial connections. The City's existing WWTP was originally constructed in 1978 and has since been upgraded and expanded several times. The WWTP consists of a headworks that includes a bar screen and splitter box, three primary clarifiers to remove settleable solids, and a series of aeration ponds to reduce biological oxygen demand. Treated effluent is disposed via spreading and percolating effluent in disposal fields adjacent to the aeration ponds. Sludge and scum from the primary clarifiers are pumped to an aerobic digester. Digested sludge is sent to sludge drying beds where the moisture evaporates, and the dried sludge is hauled offsite to a landfill. The method of Contractor Selection has not been Determined at this time.

Details

Division 01 - General Requirements.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.
Division 27 - Communications.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents