Reported | 06/02/2022 12:00 AM |
Project Title | Rear Parking Lot Reconstruction at East Brunswick Campus |
Physical Address | View project details and contacts |
City, State (County) | East Brunswick, NJ 08816 (Middlesex County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Start Expected July 2022 |
Bids Due | View project details and contacts |
Estimated Value | $300,000 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Extent of storm sewage systems work is indicated on Drawings and by requirements of this section. Note division of work between base bid and alternate bid items. B. Contractor shall clean debris, soil, sediment and foreign materials from all roof drain piping, inlets and manholes within the scope of the construction areas and flush connecting sewer pipes and manholes clean. Also refer to site clearing specification. Dispose of waste materials in a legal manner off-site. C. Contractor shall repair/reconstruct existing inlets and manholes receiving new pipe connections. D. The contractor shall maintain on-site drainage at all times. To accomplish this, temporary bypass piping, pumping or other means may be needed. The site shall not be allowed to flood. Any soils damaged by storm water flooding open excavations shall be completely removed to the satisfaction of the engineer and replaced with controlled compacted fill to its original depth. E. The contractor shall verify the activity of all storm sewers, roof drains, floor drains and other pipes encountered during excavation work, that are uncovered during earthwork, or found during other utility work. Also refer to pre-demolition work utility location requirements. Reconnect active storm sewers to new storm sewer system. F. The contractor shall perform flow & dye tests to determine the source of any underground sewer pipes that are discovered and not currently mapped and provide this information to the engineer for direction on how to re-connect, divert or abandon. G. Protect existing inlets, piping, roof leaders, and other storm sewer appurtenances, from damage during demolition and construction operations. G. Existing Utilities: Contractor shall be responsible for locating all existing utilities before commencing with any demolition work or new construction. Underground pipe locations, sizes & materials on drawings were obtained from existing mapping and field observation, and should not be considered accurate. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |