Similar Projects
DMDF Vertical Expansion
Term Contract
Design
Chicago, IL 60617

I-294 Roadway and Bridge Reconstruction and Widening
Renovation, Infrastructure
Bidding
$100,000,000 est. value
Chicago, IL

Roadway and Bridge Reconstruction and Widening
Renovation, Infrastructure
Bidding
$600,000 est. value
South Holland, IL

Lincoln Yards - Dominick Bridge
New Construction
Post-Bid
$35,000,000 est. value
Chicago, IL 60601

Bridge Replacement at Hawthorne Hills
Post-Bid
Elgin, IL

I-19-4476 Roadway and Bridge Widening and Reconstruction
Results
$25,000,000 to $50,000,000 est. value
IL

Grand Avenue Bascule Bridge and Viaduct Structural Repairs
Results
Less than $37,500,000 est. value
Chicago, IL 60602

Elim Bridge Replacement
New Construction, Demolition
Construction
Crestwood, IL

2022 Harvey Avenue Reconstruction Project
Infrastructure
Bidding
$400,000 est. value
Western Springs, IL 60558

Laurel Street Culvert Replacement
Post-Bid
Elgin, IL 60120

West Bartlett Drainage Improvements
Results
Bartlett, IL

1500 Sheridan Road Shoreline Stabilization
Infrastructure
Bidding
$200,000 est. value
Wilmette, IL 60091

Willow Walk Subdivision Drainage Improvements
Post-Bid
Arlington Heights, IL

Webster Avenue Bridge Over the North Branch of the Chicago River
Results
Chicago, IL

Skyway 75th Avenue Bearing Pedestal
Renovation
Post-Bid
Chicago, IL 60707

Reported 06/28/2022 04:35 PM
Project Title

Culvert Replacement: American Lane - Village of Schaumburg

Physical Address View project details and contacts
City, State (County) Schaumburg, IL 60173   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Construction Documents, Construction Start Expected September 2022
Bids Due View project details and contacts
Estimated Value Less than $2,300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The existing culvert on American Lane will be rehabilitated with either a cured-in-place (CIPP) liner or a geopolymer lining product. Prior to rehabilitation, the storm sewer within the project limits with be televised, and based on its condition, sections of pipe which are too deteriorated to rehabilitate will be replaced or repaired. If the pipes are in too poor of condition to make spot repairs, there would be the need to revisit the scope of this project to include reconstructing the entire culvert. Additionally, a junction chamber is to be constructed where this existing rehabilitated culvert will meet the newly constructed storm sewers in the National Parkway roadway reconstruction project. As of June 27, 2022, this project is in the final design phase and construction should start in Aug/Sept 2022. This project is included in the Village of Schaumburg's FY 2022-2027 Budget CIP. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Bridges.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents