Similar Projects
IR 90 Slide Repair
Infrastructure
Design
$500,000 CJ est. value
Madison, OH 44057

IR 90 Slide Repair
Infrastructure
Design
$500,000 CJ est. value
Madison, OH 44057

Kirtland Road - Two Lane Resurfacing
Infrastructure
Bidding
$278,000 CJ est. value
Willoughby Hills, OH 44094

Kirtland Road - Two Lane Resurfacing
Infrastructure
Bidding
$278,000 CJ est. value
Willoughby Hills, OH 44094

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Glyco II Forcemain Replacement - Contract A
Results
$1,622,193 est. value
Painesville, OH

Improvements to Lake County Executive Airport
Results
Less than $404,000 est. value
Willoughby, OH

Chick-fil-A / Willoughby
Infrastructure, Renovation
Construction
$5,000,000 CJ est. value
Willoughby Hills, OH 44094

Chick-fil-A / Willoughby
Infrastructure, Renovation
Construction
$5,000,000 CJ est. value
Willoughby Hills, OH 44094

Light Industrial Building
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Mentor, OH 44060

Pelton Road Industrial Development
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Willoughby Hills, OH 44094

SR 134 - Bridge Preservation
Demolition, New Construction, Infrastructure
Design
$610,000 CJ est. value
Martinsville, OH 45146

Sanctuary Drive Bridge Project
Infrastructure
Bidding
$1,700,000 CJ est. value
Kirtland Hills, OH 44060

Purchase of Cold Water Meters
Infrastructure
Post-Bid
OH

Last Updated 11/30/2022 03:23 PM
Project Title

Drainage Improvements for Part of Shore Drive and Vicinity

Physical Address View project details and contacts
City, State (County) Madison, OH 44057   (Lake County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $581,337 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work covered by the plans and specifications includes: storm sewer removal and installation, catch basin removal and installation, asphalt surface course, and related items. All work under this contract shall be completed by June 16, 2023 Estimate of Cost: $560,000.00 - $620,000.00 Pursuant to R.C. 153.01 et. seq., the bid must be accompanied by an original sealed document (uploaded for online bidders) in the form of a bond for the full amount (100%) of the bid OR by a certified check, cashiers check, or irrevocable letter of credit equal to ten percent (10%) of the amount bid, drawn on a solvent bank located in Lake County and payable to the Fiscal Officer, Madison Township, Ohio, as surety that if the bid is accepted, a contract will be entered into and its performance properly secured. All online Bidders must submit original within 3 days of bid opening. Should any bid be rejected said surety shall forthwith be returned to the bidder and should any bid be accepted such bid bond, certified check, cashiers check, or letter of credit will be returned to the bidder upon proper execution and securing of the contract. All online Bidders must submit their original Form of Non-collusion Affidavit within 3 days of bid opening to be considered a complete bid. No bidder shall be considered a responsive and responsible bidder or eligible to be awarded the contract to which this Notice or Bid Specifications apply, if the bidder is listed on the Auditor of State's Database as having a "Finding of Recovery" as that term is defined in R.C. 9.24. Bids shall be subject to the conditions that the right is reserved to hold bids for a period not longer than sixty (60) days after date of bid opening and/or to award the contract at any time during said period. Deadline 11/22/2022 10:00 AM EST The successful bidder will be required to execute the contract within ten (10) days after the award of the work to him/her, and he/she shall furnish acceptable bond or surety, if not filed previously to the satisfaction of Madison Township, Ohio for the faithful performance of said contract in the sum of one hundred percent (100%) of the total amount of the bid. In case of failure to execute the contract as stated or to furnish bond and/or surety, the bidder shall be considered to have abandoned the contract and is then liable for the difference between his/her bid and the next lowest bid, not to exceed ten percent (10%) of the amount bid. The Board of Trustees of Madison Township reserves the right to reject any or all bids, or to increase or decrease or omit any item or items and/or to award to the lowest and/or best bidder. Each bid must contain the full name of every person or company interested in the same. Wage Rates - Each employee employed by the contractor or any subcontractor and engaged in work on the project under this contract shall be paid prevailing wage rates for Public Improvements as provided by the appropriate Sections of the Ohio Revised Code. For further information, contact OBES Wage and Hour Division (614) 644-2239 or contact the Madison Township Prevailing Wage Coordinator (440) 428-7551. This shall occur regardless of any contractual relationship which may be said to exist between the contractor or any subcontractor and such employee. The design of this project was completed by the owners in-house design professional. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Drainage Improvement for Part of Shore Drive & Vicinity project is defined below: A. Storm sewer will be installed at various locations along Shore Drive, Sandgate Road, and Northway Road. The storm sewer is depicted in a separate plan set as part of these specifications. B. A pre-construction conference shall be scheduled with the Office of the Lake County Engineer at least seven (7) days prior to the performance of this contract. C. The work covered by this specification consists of furnishing all plant, labor, equipment, and materials in performing all operations necessary for the Drainage Improvement for Part of Shore Drive & Vicinity project in complete and strict accordance with these specifications.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents