Similar Projects
New Wastewater Treatment Plant
New Construction
Conception
Milton, FL

Northwest Wastewater Plant Operations Building
New Construction - 1,500 SF
Design
$8,000,000 to $10,000,000 est. value
Tampa, FL

Design-Build for South County Advanced Wastewater Treatment Facility Expansion
Addition
Bidding
$50,000,000 est. value
FL

South Water Reclamation Facility North Plant Effluent Pump Station Pre-Engineered Building
New Construction
Bidding
$2,111,384 est. value
Orlando, FL 32819

Greenland Water Reclamation Facility (WRF)
Sub-Bidding
$100,000,000 est. value
Jacksonville, FL 32202

Wastewater Treatment Facility Improvements Phase 1
Post-Bid
Less than $4,900,000 est. value
Davenport, FL

Port Labelle Utility System Wastewater Treatment Plant Improvements
Renovation
Post-Bid
LaBelle, FL 33935

Construction Manager at Risk Services - Embassy Hills Wastewater Treatment Plant Rehabilitation and Improvements
Results
$585,000 est. value
Port Richey, FL 34668

Construction of Vactor Dump Site WRF#2
Results
Ocala, FL 34471

New Headworks and Grit Removal Facility
Construction
$11,900,000 est. value
Clearwater, FL 33756

CR 136/I-75 Wastewater Treatment Plant
Construction
Less than $1,365,194 est. value
FL

Chemical System Upgrade
Alteration
Bidding
Marathon, FL

NCWRF EQ #3 Odor Control Improvements - Phase 1 Construction
New Construction
Post-Bid
$815,000 est. value
Naples, FL 34109

Design-Build GT LOHMEYER WWTP Replacement of Oxygen System Projects 11781 and 11917
Results
Fort Lauderdale, FL 33316

South Martin Regional Wastewater Treatment Plant Filter and Chlorine Contact Basin Improvements
Construction
Hobe Sound, FL 33455

Last Updated 10/13/2021 07:28 AM
Project Title

Ocean Outfall Legislaton Program, Construction Package St-1B, Oxygenation Trains 1-7 Rehabilitation and Electrical Buildings

Physical Address View project details and contacts
City, State (County) Miami, FL 33170   (Miami-Dade County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $81,558,147
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of furnishing all materials, labor, and equipment necessary to construct and provide fully functional systems consisting of the construction of proposed improvements to seven (7) existing oxygenation trains, construction of two (2) new electrical buildings, yard piping and site improvements at the South District Wastewater Treatment Plant (SDWWTP), located at 8950 SW 232nd Street Miami, Florida, 33190. The scope of work includes, but is not limited to: 1. Demolition - Site a. Demolition of existing piping, pavement, conduits and duct banks as indicated in the Plans 2. Demolition - Oxygenation Trains 1 to 7 a. Demolition of existing pipe penetrations into Oxygenation Trains 1 to 7. b. Enlargement of existing baffle wall openings. c. Demolition of existing effluent weirs. d. Demolition of existing 36-inch RAS pipelines at Oxygenation Trains 1 to 4 and Oxygenation Trains 5 to 7. e. Removal and salvage of existing flowmeters and knife gate valves. f. Demolition of existing 48-inch process water connections at Oxygenation Trains 1 to 7. g. Demolition of existing low-pressure oxygen pipeline as indicated in the contract documents. h. Demolition of existing mechanical aerators. i. Demolition of existing electrical conduits to equipment in the existing concrete slab of Oxygenation Trains 1 to 4 and 5 to 7 j. Demolition of existing electrical equipment in UNOX Electrical building 1-4 and 5-8 related to the existing oxygenation system in Oxygenation trains 1 to 4 and 5 to 7. 3. Construction - Oxygenation Trains 1 to 7: a. Retrofitting of oxygenation trains with step feed capability. b. Perform structural rehabilitation repairs of Oxygenation Trains 1 to 7. c. Construction of new concrete slab with electrical conduits and access ramps over existing concrete slab of Oxygenation trains 1 to 4 and 5 to 7. d. Furnishing and installation of new mechanical aerators, blowers, gates, valves, and other process mechanical equipment. e. Furnishing and installation of new sensors, including flow meters, gas samplers, wastewater analyzers, and gas detection. 4. Construction - Oxygenation Trains 1-4 and 5-8 Electrical Buildings a. Construction of two (2) new electrical buildings for Oxygenation trains 1 to 4 and 5 to 7. b. Furnishing and installation of new fire alarm system, electrical systems, SCADA system (supply of select SCADA equipment by SCADA Equipment Supplier), conduits, motor control centers, variable frequency drives, control panels, and lighting systems. c. Furnishing and installation of new HVAC systems, water source heat pumps (WHPs) cooling water pumps (CWPs), cooling towers (CTs), fans, air ducts and air purification system. d. Furnishing and installation, doors, windows and rollup doors. e. Furnishing and installation of all plumbing. f. Furnishing and installation of all appurtenances for control room. 5. Construction - Site and Yard Piping a. Site grading and construction of new yard piping and electrical conduits to connect new structures to the SDWWTP existing electrical, water, sewer, process water, fire alarm and SCADA systems. b. Construction of new pavement and sidewalks around new structures. c. Improvements to the SDWWTP potable water, fire water and plant water distribution networks, including replacement of existing yard piping. d. Contractor shall expose all tie-in locations prior to preparation of Shop Drawings. e. Contractor is responsible for groundwater dewatering as well as any dewatering and disposal of dewatered fluids from the pipe itself for all tie-ins. f. Isolation valves are available for all tie-ins; however, the Contractor shall assume that all tie-ins will require additional temporary isolation provided by the Contractor should the isolation valves not completely shut.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents