Similar Projects
Last Updated | 04/09/2021 08:29 AM |
Project Title | Railroad Avenue Pump Station Improvements |
Physical Address | View project details and contacts |
City, State (County) | Hilton, NY (Monroe County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Replacement of the Railroad Avenue pump station force main, including approximately 1,250 linear feet of 8-inch diameter force main installed by open cut methods and 850 linear feet of 8 IN diameter force main installed by directional drilling. The project also includes the replacement of an existing pump stations backup pump force main with approximately 85 Linear Feet of 4 IN diameter force main. With each force main replacement, new connections to the pump station are also part of the project. The force main replacements also include new manholes for air/vacuum valving and other related appurtenances. The project also included miscellaneous gravity sewer improvements and manhole installations. The project includes all necessary temporary erosion control, turf restoration, asphalt pavement restoration, gutter restorations, and sidewalk restoration. |
||||||||||||||||||||||||||||||||||||||||||||||
Details | Lift and Pump Stations, Renovation.
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |