Similar Projects
DET Circuit Breaker Testing and Cleaning
Bidding
Madison, WI

Lakeview Library Lighting Upgrade
Bidding
$80,000 est. value
Madison, WI 53704

Replace Electrical-Building 19 607-19-107
Post-Bid
$2,000,000 to $5,000,000 est. value
Madison, WI

Replace Electrical-Building 19
Post-Bid
$2,000,000 to $5,000,000 est. value
Madison, WI 53705

911 Center Data Room Backup Cooling
Results
Madison, WI 53703

HVAC Upgrade
Results
Less than $225,000 est. value
Madison, WI 53593

MMHI-21-11 Powerplant Chiller Repair and Service
Term Contract
Post-Bid
Less than $50,000 est. value
Madison, WI 53704

Switchgear Breaker Upgrades
Results
Less than $230,000 est. value
Madison, WI 53704

Refrigerant Monitoring System Replacement
Post-Bid
Less than $150,000 est. value
Madison, WI

2020 Public Works Garage Lighting Upgrades
Results
Less than $25,000 est. value
Monona, WI 53716

Madison Public Library Lighting - Hawthorne
Post-Bid
Less than $80,000 est. value
Madison, WI 53704

Steam Turbine Generator Improvements
Results
Less than $500,000 est. value
Madison, WI 53704

Mold Abatement and Site Restoration Services
Term Contract
Post-Bid
Madison, WI

2021 Fiber Projects
Renovation
Results
Madison, WI

Municipal Building Solar
Post-Bid
$280,000 est. value
Middleton, WI 53562

Last Updated 11/11/2020 06:32 AM
Project Title

Utility Renovations - Mechanical

Physical Address View project details and contacts
City, State (County) Madison, WI 53703   (Dane County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Electric, HVAC, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,000,000
Plans Available from Architect/Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Phase 1 - replace 600 LF direct buried steam, condensate & compressed air piping between the central utility tunnel and Tallent Hall. The replacement includes excavation to expose the existing direct buried pipes, remove existing pipes, install new pipes, site restoration to match existing of all areas disturbed. Phase 2 - Waterproofing the top and sides of the existing, underground central utility tunnel, repair leaks in enclosure of the tunnel including addressing spalling concrete and filling in the 'crotch' areas at vaults with flowable fill. Drain tiles will be installed alongside the entire tunnel on both sides. Trees in the utility tunnel defined access areas will be removed. Replace steam expansion joint #4 and anchor A7 within the central utility tunnel and remove water valve WV-29 and water valve extensions near Tallent Hall. Excavation and shoring required.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents