Similar Projects
Blair Park Sidewalk Project - Williston STP BP17(12)
Results
Less than $250,000 est. value
Williston, VT

Shelburne Community School Paving Project
Results
Shelburne, VT 05482

Greenway Rehabilitation Phase 3B South Construction
Results
$750,000 to $1,000,000 est. value
Burlington, VT 05401

Mansfield Avenue Sidepath and Traffic Calming
Infrastructure
Post-Bid
$250,000 to $500,000 est. value
Burlington, VT 05401

Underhill STP BP13(5) Park Street and VT Route 15 Sidewalk
Results
$250,000 to $500,000 est. value
Underhill, VT 05489

Schmanska Park Pathways Construction
Infrastructure
Results
$40,790 est. value
Burlington, VT 05401

TA 6E and 8C Trail Improvements Project at the Ethan Allen Firing Range
Infrastructure
Results
Jericho, VT 05465

Kennedy Drive at West Twin Oaks Terrace Mid-Block Pedestrian Crossing
Infrastructure
Post-Bid
$200,000 to $240,000 est. value
South Burlington, VT

Colchester Causeway Connector Path Construction
Infrastructure
Post-Bid
Colchester, VT

Champlain Parkway MEGC M5000(1) - Initial Contract
Infrastructure
Post-Bid
$25,000,000 to $50,000,000 est. value
Burlington, VT

CY-22 Sidewalk Program
Infrastructure
Bidding
$1,000,000 est. value
Burlington, VT

Bombardier Road Sidewalk
Infrastructure
Bidding
Milton, VT 05468

Allen Road Shared-Use Path
Results
South Burlington, VT 05403

Castle Trail Improvements
Infrastructure
Post-Bid
Jericho, VT

University Place Street Improvements
Infrastructure
Post-Bid
$1,000,000 to $1,500,000 est. value
Burlington, VT 05408

Reported 03/19/2022 12:00 AM
Project Title

2022 Sidewalk Spot Repairs Project

Physical Address View project details and contacts
City, State (County) Colchester, VT 05446   (Chittenden County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Sidewalk Spot Repair Locations 59 and 60, College Parkway (Route 15) 273, Julie Drive 307, Willaims Road 383, Old Sawmill Road 421, Blakely Road 555, Reynolds Drive 960, Lindale Drive 964, Lindale Drive 1084, Arbor Lane 1135, Chimney Hill Drive 1325, Eagle Park Drive 1497, Woodrose Lane 1867, Bluebird Drive 1868, Bluebird Drive 1869, Bluebird Drive

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents